Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

CORBY POWER LIMITED

73 unique locations (852 components) - Page 2 of 3

Active MW: 1040.63 MW
Inactive MW: 1439.36 MW
Daisy Close, Corby, Northamptonshire, NN18 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
0.61 MW
DASH FARM CLOSE WELDON CORBY NN17 (12 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
0.61 MW
Deenethorpe, Corby, NN17 (2 components)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
0.61 MW
DEENETHORPE CORBY NN17 (10 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
0.61 MW
DEENETHORPE CORBY NORTHAMPTONSHIRE NN17 (11 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
0.61 MW
DENMARK CLOSE CORBY NORTHAMPTONSHIRE NN18 (12 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
0.61 MW
DUNNOCK ROAD CORBY NORTHAMPTONSHIRE NN18 (15 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
0.61 MW
EDF Energy (Thermal Generation) Limited, West Burton B Power Station, West Burton, Retford, Nottinghamshire, DN22 9BL (19 components)
• The CMU is a Open Cycle Gas Turbine (OCGT)
• The CMU will be formed of multiple individual diesel reciprocating generating units controlled centrally and exporting to the distribution system.
• West Burton B Power Station CMU 2 WB2-20= 100% T_WBURB-2
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Enterprise Drive, Coven, Wolverhampton, Staffordshire WV10 7DY (9 components)
• CHP Plant connected to Private Wire System (operated by INEOS Infrastructure (Grangemouth) Limited) with Connection to NETS
• Municipal waste incineration plant located in Staffordshire. It is based on boilers supplying steam to a turbine-generator.
• Reciprocating genset
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Glyndebourne Gardens, Corby, Northamptonshire, NN18 (10 components)

EV charging on residential premises

Active • 2026-27 (T-4), 2025-26 (T-4) ...
0.61 MW
Greeve Close Corby Northamptonshire NN18 (12 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
0.61 MW
HAMERTON ROAD ALCONBURY WESTON HUNTINGDON CAMBRIDGESHIRE PE28 (24 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
HEMPLAND CLOSE, GREAT OAKLEY, CORBY, NORTHAMPTONSHIRE, NN18 (12 components)

EV charging on residential premises

Active • 2026-27 (T-4), 2025-26 (T-4) ...
0.61 MW
HUNTINGDON CLOSE CORBY NORTHAMPTONSHIRE NN18 (11 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
0.61 MW
IRNHAM ROAD CORBY GLEN GRANTHAM LINCOLNSHIRE NG33 (11 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
0.61 MW
KESTREL ROAD CORBY NORTHAMPTONSHIRE NN17 (12 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
0.61 MW
Land at Enterprise Court, Corby, NN18 8ES (62 components)
• Gas fired reciprocating engines.
• N/A
• Reciprocating genset
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Land off Sookholme Road, Vernon Street Industrial Estate, Shirebrook, Mansfield, NG20 8SG (24 components)
• Reciprocating genset
• The CMU is a gas plant, capable of running in either OCGT or CCGT modes
• The Moyle Interconnector links the electricity grids of Northern Ireland and Scotland through submarine cables running between converter stations at Ballycronan More in Islandmagee, County Antrim and Auchencrosh in Ayrshire. The link has a capacity of 500 MW. The Moyle Interconnector is owned and operated by Moyle Interconnector Limited, which is in turn financed through Moyle Holdings Limited and Moyle Interconnector (Financing) Public Limited Company, all part of the Mutual Energy Limited group of companies.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Land on the east side of Cowpen Bewley Road, Billingham,  TS23 4ED (26 components)
• Gas peaking reciprocating engine
• On-site CHP - existing generating unit Maesgwyn Farm, Chirk, Wrexham, LL14 5NT SJ 284 383
• Reciprocating genset
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Land on the south west of Brigg Road, Scunthorpe, North Lincolnshire, DN16 1AP (21 components)
• Gas engines in commercial horticultural environment with no auxilliary load. All generation unit capacities are nominal and allow for site-specific variations
• Multiple gas engines capable of exporting electricity.
• The CMU is a Open Cycle Gas Turbine (OCGT)
Active • 2026-27 (T-4), 2024-25 (T-4) ...
Larratt Road Corby Northamptonshire NN17 (10 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
0.61 MW
LINGFIELD WALK CORBY NORTHAMPTONSHIRE NN18 (11 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
0.61 MW
LIVINGSTONE ROAD CORBY NORTHAMPTONSHIRE NN18 (12 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
0.61 MW
Loading map...
Showing 25 locations