Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

CS15 Limited

2 unique locations (4 components)

Active MW: 0.00 MW
Inactive MW: 0.00 MW
Grand Union Canal Walk, Hayes UB3 4DG (3 components)

The proposed power plant would consist of a number new highly efficient gas fired generating units plus ancillary equipment. Each genset is based on advanced reciprocating engine technology. (3)

Reciprocating engines CS15 Limited New Build Generating CMU Hyde NorthHyde20 Not Prequalified UB3
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Grand Union Canal Walk, Hayes UB3 4DG, UK (1 component)

The proposed power plant would consist of a number new highly efficient gas fired generating units plus ancillary equipment. Each genset is based on advanced reciprocating engine technology.

Reciprocating engines CS15 Limited New Build Generating CMU North Hyde Conditional UB3
Inactive • 2022-23 (T-4)
Loading map...
Showing 2 locations