Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

CONRAD ENERGY (DEVELOPMENTS) LIMITED

43 unique locations (1098 components) - Page 1 of 2

Active MW: 1048.04 MW
Inactive MW: 1779.67 MW
William Lee - Site 2, Callywhite Lane, Dronfield, S182XU (14 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2028-29 (T-4), 2026-27 (T-4) ...
WHITEFIELD ROAD, BREDBURY, STOCKPORT, CHESHIRE, SK6 2QP (6 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Inactive • 2023-24 (T-4), 2021-22 (T-4) ...
The Tennis Witney Oxfordshire OX29 (5 components)

EV charging at residential premises

Active • 2026-27 (T-4), 2024-25 (T-1) ...
Tees Valley Nursery, The Moat, Belasis Hall, TS23 4ED (34 components)
• District heating implementation with one asset 1.013MW exporting excess capacity to distribution network. Primary fuel type = Natural Gas. All generation unit capacities are nominal and allow for site-specific variations.
• The CMU component TEES01 is one gas-fired Jenbacher CHP engine. It will be supplying heat, CO2 and power to the on-site tomato Nursery all year.
• The CMU component TEES02 is one gas-fired Jenbacher CHP engine. It will be supplying heat, CO2 and power to the on-site tomato Nursery all year.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Sloy Power Station, Arrochar, G83 7DP (26 components)
• 1 x hydro turbine & synchronous generator
• Genset 2
• Genset 3
Active • 2028-29 (T-4), 2027-28 (T-4) ...
SIMEC Lochaber Power Lochaber Smelter North Road Fort William PH336TH (65 components)
• Hydro power turbine generator Unit 1 of the Lochaber Smelter hydro power plant, connected to a private network which in turn is connected to the local distribution network. The MPANs relate to the connection of the private network to the distribution network only. They will not be used for settlement purposes. Instead this CMU component will use bespoke net metering.
• Hydro power turbine generator Unit 4 of the Lochaber Smelter hydro power plant, connected to a private network which in turn is connected to the local distribution network. The MPANs relate to the connection of the private network to the distribution network only. They will not be used for settlement purposes. Instead this CMU component will use bespoke net metering.
• Hydro power turbine generator Unit 5 of the Lochaber Smelter hydro power plant, connected to a private network which in turn is connected to the local distribution network. The MPANs relate to the connection of the private network to the distribution network only. They will not be used for settlement purposes. Instead this CMU component will use bespoke net metering.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Shawhouse Farm, Clitheroe Road, Clitheroe, Lancashire, BB7 9AD (3 components)
• 10 x 2 MW Gas fuelled engines with connections to the distribution and gas networks. The engines will be sited on a compound at Shawhouse Farm, Clitheroe, BB7 9AD
• N/A
Inactive • 2023-24 (T-4), 2022-23 (T-3)
Pit Hey Place, Pimbo Industrial Estate, Skelmersdale, WN8 9PS (2 components)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Inactive • 2022-23 (T-3), 2020-21 (T-4)
NTT Communications HH3, The Campus, Maylands Avenue, Hemel Hempstead, HP2 7EF (4 components)

10MW - 11.5MWh Battery Energy Storage System

Active • 2025-26 (T-4), 2022-23 (T-1)
Mitchell Road, Phoenix Parkway, Corby, Northamptonshire, NN17 5QT (45 components)
• The CMU is a Open Cycle Gas Turbine (OCGT)
• The CMU is a combined cycle gas turbine
• The CMU is a gas plant, capable of running in either OCGT or CCGT modes
Active • 2028-29 (T-4), 2026-27 (T-4) ...
Maybrook Road, Maybrook Business Park, Minworth, Sutton Coldfield, B76 1BE (18 components)
• N/A
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant.
Active • 2026-27 (T-4), 2025-26 (T-4) ...
Maidenhead Road, Windsor, SL4 5GD (11 components)
• Battery storage
• Battery strorage unit
• N/A
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Luton Road Toddington Bedfordshire LU5 6HT (3 components)
• Load Response - Automated Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Inactive • 2022-23 (T-3), 2020-21 (T-1)
Larport Farm Larport Lane Dormington Hereford HR1 4EP (4 components)

19.500 MW of battery storage located at Hereford.

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Land south of Halesfield 13, Telford, TF7 4PL (2 components)
• 5MW of Lithium Ion battery storage and power conversion systems.
• Aggregate CMU from multiple sources
Inactive • 2023-24 (T-4), 2022-23 (T-3)
Land north of Radstock Road, Midsomer Enterprise Park, Radstock Road, Midsomer Norton, Radstock, BA3 2AF (10 components)
• Existing CMU comprising of battery storage and associated plant
• Load reduction upon instruction
• New Build CMU comprising of battery storage and associated plant
Active • 2026-27 (T-4), 2025-26 (T-1) ...
Land at Wood Farm Swindon Road Wroughton Swindon SN4 9BZ (1 component)

The CMU component is an aggregation of turn-down and onsite generation

Inactive • 2021-22 (T-4)
Land at Hound Farm, Hound Road, Netley, Southampton, SO31 5FS (10 components)
• Component has yet to be procured.
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Active • 2027-28 (T-4), 2025-26 (T-4) ...
Land at Bumpers Farm, Ilmer, Buckinghamshire, HP27 9RE (17 components)
• A new build 49.5MW battery energy storage system
• A new build battery energy storage system
• Connah's Quay PS Unit 1 CCGT
Active • 2026-27 (T-4), 2025-26 (T-4) ...
Land at Broadditch Farm, New Barn Road, Southfleet, DA13 9PU (9 components)
• A new build 10MW battery storage system
• A new build 11MW battery storage system
• Office site with behind the meter bio-diesel generation - offsetting site load and exporting surplus
Active • 2025-26 (T-4), 2023-24 (T-1) ...
Ketton Works, Stamford, PE9 3SX (5 components)
• Hanson site - Is Load Reduction/ Turn Down
• Proven reduction of site consumption
Active • 2025-26 (T-1), 2022-23 (T-4) ...
Hollinwood Avenue Chadderton OL9 8EP (3 components)

Commercial printers

Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
Hawarden Industrial Park Clwyd Close Manor Lane Hawarden Deeside CH5 3PZ (10 components)
• Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Inactive • 2023-24 (T-4), 2022-23 (T-1) ...
Loading map...
Showing 25 locations