CENTRICA BUSINESS SOLUTIONS UK OPTIMISATION LIMITED

21 unique locations (159 components)

Active MW: 881.00 MW
Inactive MW: 4153.24 MW
1 Rivington Rd, Preston Brook, Runcorn WA7 3DP, United Kingdom (13 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms. (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
1 Waterfront Avenue, Edinburgh, EH5 1SG (24 components)
• Glenhove Water Pumping Station
• Office site with behind the meter generation
• On-site existing CHP generating unit
Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
2 Leeds City Office Park, Leeds, LS11 5BD (8 components)
• Office site with behind the meter back-up generation (2)
• Office site with behind the meter back-up generation.
DSR Veolia UK Limited Conditional LS11
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
97 Talbot Road, Stretford, Manchester, Lancashire, M16 0TW (4 components)

Offsite with behind the meter generation (2)

Inactive • 2022-23 (T-4), 2019-20 (T-1)
Asda Gosforth Wansbeck Road, Wansbeck Road South Fawdon, Newcastle, NE3 3HQ (10 components)
• Load curtailment
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2025-26 (T-4) ...
Asda Witham Highfields Road, Benfield Way Lakes Road Braintree CM7 3YS (10 components)
• Load reduction
• Load reduction.
Active • 2025-26 (T-4), 2022-23 (T-4) ...
Bott Lane, Lye, Stourbridge, West Midlands DY9 7AW (10 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
British Gas, 4 Marine Drive, Edinburgh, EH5 1SG (2 components)

Office site with behind the meter bio-diesel generation - offsetting site load and exporting surplus

Active • 2026-27 (T-4), 2025-26 (T-4)
3.08 MW
British Gas, Housesteads, Off Stockport Road, Hattersley, SK14 3QU (4 components)

Office site with behind the meter back-up generation.

Inactive • 2022-23 (T-4), 2019-20 (T-1)
CAULDON LOW QUARRY, CAULDON, STOKE ON TRENT, STAFFORDSHIRE, ST10 3EW (6 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Inactive • 2023-24 (T-4), 2021-22 (T-4) ...
Chenhalls Road St Erth Hale Cornwall TR27 6LA (5 components)

Water treatment centre

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Land at Claredown Farm Hickford Hill Belchamp St Paul Sudbury Essex CO10 7DW (8 components)
• 20 MW of DSR
• 20 MW of demand reduction
• 20MW Battery Storage Facility located in Sudbury, Essex.
• ... and 1 more unique description
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Marks & Spencer - Stockley Park, 3 Longwalk Road, Stockley Park, Uxbridge, UB11 1AW (10 components)
• DSR Component providing load turn down at a retail store
• Import/Export metering with diesel generation at a retail store
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Meeting Business Park, Park Road, Ormsgill, Barrow-in-Furness, Cumbria, England, LA14 4TL, United Kingdom LA14 4TL (1 component)

Hydrogen Production plant consisting of six of 5.2MVA Electrolyser blocks with over 8hours of Hydrogen storage which each can flexible ramp up/down between 0% and 100% of load.

Active • 2027-28 (T-4)
National Distribution Centre, Barnsdale Way, Grove Park, Leicester, LE19 1SU (10 components)

Distribution Centre with behind the meter back-up generation.

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
North Avenue, Marston Green, Birmingham, B40 1NT. (10 components)

Gas Generator - ENER-G 1521 - proposed to be installed on land to the north-east elevation of Hall 5 at the NEC Site.

Active • 2024-25 (T-4), 2023-24 (T-4) ...
Olympia Mills, Barlby Rd, Selby YO8 5AF multisite (5 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2026-27 (T-4), 2023-24 (T-1)
Windsor Road, Redditch, Worcestershire, B97 6EF (8 components)

The CMU is composed of two CHPs (ECOMAX® 15 NGS) with an electrical output capacity of 1.501 MWe each. The CMU will supply electricty on site to METTIS AEROSPACE LIMITED.

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Loading map...
Showing 21 locations