CENTRICA BUSINESS SOLUTIONS UK OPTIMISATION LIMITED

106 unique locations (1865 components) - Page 1 of 5

Active MW: 881.00 MW
Inactive MW: 4153.24 MW
1 Rivington Rd, Preston Brook, Runcorn WA7 3DP, United Kingdom (13 components)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• On-site existing CHP generating unit
• The proposed power plant would consist of a number new highly efficient gas fired generating units plus ancillary equipment. Each genset is based on advanced reciprocating engine technology.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
1 Waterfront Avenue, Edinburgh, EH5 1SG (25 components)
• Glenhove Water Pumping Station
• Office site with behind the meter generation
• On-site existing CHP generating unit
Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
2 South Wardpark Place, Wardpark, Cumbernauld, Glasgow, North Lanarkshire, G67 3HX (35 components)
• EV charging at residential premises
• Operational Reciprocating Engine
• Operational gas reciprocating engine.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
35 Arkwright Road, Astmoor, Runcorn, WA7 1NU. (2 components)
• On-site existing CHP generating unit
• The batteries are housed within racks and installed, together with converters, inside an existing building. The batteries will be installed in the racks off-site and then delivered to site ready for lay-down, connection to the sub-station, testing and commissioning.
Active • 2024-25 (T-4), 2022-23 (T-4)
3 Fountain Drive, Inchinnan Business Park, Paisley, PA4 9RF. (5 components)
• 1 x hydro turbine & synchronous generator
• Bus depot site
• MTU - 8V400064 1.013MW
Active • 2024-25 (T-1), 2023-24 (T-4) ...
97 Talbot Road, Stretford, Manchester, Lancashire, M16 0TW (5 components)
• Offsite with behind the meter generation
• On-site existing CHP generating unit
Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
Aberthaw Power Station The Leys Aberthaw Barry Mid Glamorgan CF62 4ZW (90 components)
• E1000 CHP
• Existing CCGT
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2026-27 (T-4), 2024-25 (T-4) ...
Ainsworth Lane, Knowsley, Prescot, Mereyside, L34 9EU (11 components)
• On-site existing CHP generating unit
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Inactive • 2021-22 (T-4), 2018-19 (T-1)
Arrowe Park Road, Upton, Birkenhead, Wirral CH49 5PE (7 components)

On-site existing CHP generating unit

Inactive • 2022-23 (T-4), 2019-20 (T-1) ...
Asda Gosforth Wansbeck Road, Wansbeck Road South Fawdon, Newcastle, NE3 3HQ (10 components)
• Gas Turbine Cogeneration Unit GT3
• Load curtailment
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2025-26 (T-4) ...
Asda Witham Highfields Road, Benfield Way Lakes Road Braintree CM7 3YS (10 components)
• CHP unit
• Load reduction.
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Active • 2026-27 (T-4), 2025-26 (T-4) ...
Barrack Road, Exeter, EX2 5DW. (6 components)
• 1.521 MW CHP unit
• Aggregate CMU from multiple sources
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Blackshaw Rd, London SW17 0QT (9 components)

CHP on a hospital site

Inactive • 2021-22 (T-4), 2020-21 (T-1) ...
Bristol Royal Infirmary, Marlborough Hill, Bristol, BS2 8HW (14 components)
• 1 * 1.7MW diesel reciporcating engine
• 1 * 1.7MW diesel reciprocating engine
• on site generating CMU
Active • 2027-28 (T-4), 2026-27 (T-4) ...
Bristol Royal Infirmary, Marlborough Hill, Bristol, BS2 8HW. (12 components)
• BM unit T_DINO-1 at Dinorwig Power Station (Pumped Storage)
• CHP Engine 3.360MW
Active • 2026-27 (T-4), 2025-26 (T-4) ...
British Gas, Bothwell Road, Uddingston, Glasgow, G71 7TW (42 components)
• BM unit T_DINO-1 at Dinorwig Power Station (Pumped Storage)
• Office site with behind the meter bio-diesel generation - offsetting site load and exporting surplus
• On-site existing CHP generating unit
Active • 2027-28 (T-4), 2024-25 (T-4) ...
British Gas, Housesteads, Off Stockport Road, Hattersley, SK14 3QU (5 components)
• Office site with behind the meter back-up generation.
• On-site existing CHP generating unit
Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
British Steel Limited, Administration Building, Brigg Road, Scunthorpe, North Lincolnshire, DN16 1XA (46 components)
• Hamms Hall - Existing Site CHP
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• existing CHP on site
Active • 2028-29 (T-4), 2027-28 (T-4) ...
British Steel Limited, Administration Building, Brigg Road, Scunthorpe, North Lincolnshire, England, DN16 1XA (26 components)
• On-site existing CHP generating unit
• existing CHP on site.
• existing on site CHP
Active • 2027-28 (T-4), 2026-27 (T-4) ...
Britned Convertor Station, Gate C, Grain Road, Isle of Grain, Kent, ME3 0AE (15 components)
• BritNed is a 1200MW (TEC) electricity interconnector connecting the electricity transmission systems in the Netherlands and Great Britain.
• BritNed is a 1320MW (CEC) electricity interconnector connecting the electricity transmission systems in the Netherlands and Great Britain.
• BritNed is a electricity interconnector connecting the electricity transmission systems in the Netherlands and Great Britain.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Cardiff Road, Barry, Vale of Glamorgsan, CF63 2YL (34 components)
• DSR components to be assigned prior to the start of the Delivery Year.
• Gas Turbine CHP GT001B
• Steam Turbine CHP
Active • 2026-27 (T-4), 2025-26 (T-4) ...
Loading map...
Showing 25 locations