Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

CENTRICA BUSINESS SOLUTIONS UK OPTIMISATION LIMITED

58 unique locations (503 components) - Page 1 of 3

Active MW: 881.00 MW
Inactive MW: 4153.24 MW
Windsor Road, Redditch, Worcestershire, B97 6EF (9 components)
• 2026 kW CHP unit
• A Battery Energy Storage System
• The CMU is composed of two CHPs (ECOMAX® 15 NGS) with an electrical output capacity of 1.501 MWe each. The CMU will supply electricty on site to METTIS AEROSPACE LIMITED.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Waterswallows, Tunstead Quarry, Tunstead, Buxton, Derbyshire SK17 8TG (23 components)
• On-site existing CHP generating unit
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Inactive • 2023-24 (T-1), 2022-23 (T-4) ...
Unit 13 Newby Road Industrial Estate Hazel Grove Stockport SK7 5DA (1 component)

Office site with behind the meter bio-diesel generation - offsetting site load and exporting surplus

Inactive • 2020-21 (T-4)
Stanlow Manufacturing Complex, Ellesmere Port, Cheshire, CH65 4HB (9 components)
• 2 x On-site turbo alternators
• 6 x On-site turbo alternators
• Power Recovery Train
Inactive • 2019-20 (T-1)
Southdownview Way, Worthing, West Sussex, BN14 8QH (14 components)
• CHP and autogeneration
• DSR component providing load turn-down at a paper product manufacturing site
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Salmon Fields, Royton, Greater Manchester, OL2 6HT (2 components)
• Energy facility comprising of reciprocating engine sets.
• Office site with behind the meter generation
Inactive • 2023-24 (T-4), 2021-22 (T-4)
Old Gloucester Rd, Alveston, Bristol, UK, BS37 9TU (8 components)
• On-site existing CHP generating unit
• This CMU is formed of a battery bank and PCS capable of providing 10MW of power. The system is connected via switch gear and a transformer to the 132kV network in WPD's West Midland region.
Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
Melton Ross Quarries Barnetby, North Lincolnshire, DN38 6AE (4 components)
• 0.8 MWe Gas Powered Generation Unit
• 0.8 MWe Gas powered generator
Inactive • 2019-20 (T-1), 2018-19 (T-1)
Melton Ross Quarries Barnetby, North Lincolnshire, DN38 6AE (2 components)
• 0.8 MWe Gas Powered Generation Unit
• 0.8 MWe Gas powered generator
Inactive • 2019-20 (T-1), 2018-19 (T-1)
Maxi Readymix Concrete, Enderby Road,Industrial Estate, Whetstone, Leicester LE8 6HZ (5 components)
• New build power station comprised of multiple reciprocating engines.
• On-site existing CHP generating unit
Inactive • 2022-23 (T-3), 2021-22 (T-4) ...
Maidenhead Road, Windsor, SL4 5GD (11 components)
• Battery storage
• Battery strorage unit
• N/A
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Liberty Steel Newport, Coroporation Road, Newport, NP19 4XE (9 components)
• 6 diesel generators built on an existing industrial site although alternative fuel sources are also being considered.
• 6 diesel generators built on an existing industrial site, although alternative fuels are being tested before a final decision is made.
• Office site with behind the meter bio-diesel generation - offsetting site load and exporting surplus
Inactive • 2023-24 (T-4), 2020-21 (T-4) ...
Land to the south east of Leyland National Substation, Braithwaite Road, Lillyhall Industrial Estate, Workington, CA14 4ED (4 components)
• 2.5 MW power plant comprising a series of gas reciprocating engines
• On-site existing CHP generating unit
Inactive • 2022-23 (T-4), 2017-18 (T-1)
Land off, Dale Road, Spondon, Derby, East Midlands, England, DE21 7DL (2 components)
• 10 gas reciprocating engines used for power generation, with associated infrastructure.
• Palm Paper Limited operates a large paper making site in King's Lynn, Norfolk. The onsite industrial process is an energy intensive paper recycling and manufacturing plant. Palm Paper plans to shut down predetermined parts of this recycling process in response to system stress events and thereby deliver the stated load reduction capacity.
Inactive • 2021-22 (T-4), 2020-21 (T-4)
Land off Bicester Road Bicester Oxfordshire OX26 6EP (2 components)
• Gas fuelled generation plant
• Office site with behind the meter bio-diesel generation - offsetting site load and exporting surplus
Inactive • 2022-23 (T-4), 2022-23 (T-3)
Land at Fawley , Northern Access Road, Southampton, SO45 1BD  (7 components)
• CMU Component is 500kVA reciprocating diesel engine.
• Gas Turbine CHP GT001B
• Taylor's Lane OCGT GT Unit 3 Unit fuelled by Gas Oil as specified in BS 2869 Class A2
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Loading map...
Showing 25 locations