CENTRICA BUSINESS SOLUTIONS UK OPTIMISATION LIMITED

159 unique locations (2446 components) - Page 1 of 7

Active MW: 881.00 MW
Inactive MW: 4153.24 MW
Woodhouse Energy Centre A. Pearson and Sons? Nursery Alderley Edge SK9 7UW (12 components)
• A gas engine CHP site providing hot water to a local district heating network, as well as providing some power direct via private wire to a local hotel
• Didcot 2 OCGT - Power factor used for conversion of kVA to MW is 1 . Fuel type is distillate MSID: 4032
• The CMU Component will have a connection capacity of 3.298MW net of 46kW auxiliary load. Gas-fired reciprocating engine will be the technology used.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
Winnington CHP Winnington Lane Winnington Northwich Cheshire CW8 4GX (47 components)
• Continuously operating, maximum output GE gas turbine driving a 47.020MVA Alstom generator at 0.85 power factor.
• Continuously operating, maximum output GE gas turbine driving a 47.020MWA Alstom generator at 0.85 power factor.
• Continuously operating, variable output Man Diesel Turbo single pass-out back pressure turbine driving a 19.300 MVA TD Power Systems generator at 0.85 power factor.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
Windsor Road, Redditch, Worcestershire, B97 6EF (9 components)
• 2026 kW CHP unit
• A Battery Energy Storage System
• The CMU is composed of two CHPs (ECOMAX® 15 NGS) with an electrical output capacity of 1.501 MWe each. The CMU will supply electricty on site to METTIS AEROSPACE LIMITED.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Windsor Battery West, Millstream East, Maidenhead Road, Windsor, Berkshire, SL4 5GD. (9 components)
• Battery Storage
• Chemical manufacturer
• Glenlee hydro power station - Unit 2, part of the Galloway hydroelectric scheme The registered capacity of the Glenlee hydro power station is 30MVA or 24MW at 0.8PF and each of the 2 identical generating unit components at the station is 12MW.
Active • 2026-27 (T-4), 2025-26 (T-4) ...
Windsor Battery East, Millstream East, Maidenhead Road, Windsor, Berkshire, SL4 5GD. (10 components)
• Battery Storage
• Gas reciprocating engines
• Glenlee hydro power station - Unit 1, part of the Galloway hydroelectric scheme. The registered capacity of the Glenlee hydro power station is 30MVA or 24MW at 0.8PF and each of the 2 identical generating unit components at the station is 12MW.
Active • 2026-27 (T-4), 2025-26 (T-4) ...
WHITLEY GOLF COURSE CORSHAM ROAD, SHAW, MELKSHAM SN12 8EQ. (Nearest postcode to grid reference: SN12 8EH). (18 components)
• Battery Storage Plant
• Battery storage unit
• Steam Driven Turbo Alternator 8G1 6,8 MWe
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Westexe, Tiverton, Devon, EX16 5LL (8 components)
• 2026 kW CHP unit
• The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system.
Active • 2026-27 (T-4), 2023-24 (T-1) ...
Weetabix, Station Rd, Burton Latimer, Kettering NN15 5JR, United Kingdom (27 components)
• Component has yet to be procured.
• EnerG 1000 CHP
• On-site CHP - existing generating unit
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Waterswallows, Tunstead Quarry, Tunstead, Buxton, Derbyshire SK17 8TG (23 components)
• On-site existing CHP generating unit
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Inactive • 2023-24 (T-1), 2022-23 (T-4) ...
Water Orton, Birmingham, B46 1NU See attached location note (2 components)
• Gas fired reciprocating engines.
• Palm Paper Limited operates a large paper making site in King's Lynn, Norfolk. The onsite industrial process is an energy intensive paper recycling and manufacturing plant. Palm Paper plans to shut down predetermined parts of this recycling process in response to system stress events and thereby deliver the stated load reduction capacity.
Active • 2024-25 (T-4), 2021-22 (T-4)
via entrance at 132 Manchester Road, Carrington, Manchester, M31 4AY (4 components)
• 247.5MW capacity system with 520MWh of batteries with all ancillary equipment to be installed on the Trafford Site.
• Palm Paper Limited operates a large paper making site in King's Lynn, Norfolk. The onsite industrial process is an energy intensive paper recycling and manufacturing plant. Palm Paper plans to shut down predetermined parts of this recycling process in response to system stress events and thereby deliver the stated load reduction capacity.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2027-28 (T-4), 2022-23 (T-3) ...
Unit 3015 Western Approach Distribution Park Govier Way Bristol BS35 4GG (8 components)
• 8 x 1mw gas generator units to be installed on designated land at Steventon Road - Connection offer is for 13mw which is split between CMUs - further detail in covering letter
• E1000 CHP unit
Active • 2025-26 (T-4), 2023-24 (T-1) ...
Unit 13 Newby Road Industrial Estate Hazel Grove Stockport SK7 5DA (1 component)

Office site with behind the meter bio-diesel generation - offsetting site load and exporting surplus

Inactive • 2020-21 (T-4)
Treviscoe Dryer, Little Treviscoe, St. Austell, PL26 7QN (18 components)
• E1000 CHP
• Gas CHP in St. Austell
• Gas fired CHP unit
Active • 2026-27 (T-4), 2025-26 (T-4) ...
Thirsk Factory, Dalton Airfield, Topcliffe, Thirsk, YO7 3HE. (10 components)
• 1.280MW CHP
• Aggregate CMU from Multiple Sources
• BM unit T_DINO-5 at Dinorwig Power Station (Pumped Storage)
Active • 2026-27 (T-4), 2025-26 (T-4) ...
The Canalside, Marsh Lane, off Showground Road, Bridgwater, Somerset, TA6 6LQ (20 components)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• New build windfarm.
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
Thatcham Grid Substation, Piper's Lane, Off Station Road, Thatcham, RG19 4NA (15 components)
• 6 x reciprocating engines
• Auxiliary supply is subtracted prior to Bespoke Metering point MSID - NIA M1 ? 18042602
• Distribution Centre with behind the meter back-up generation.
Active • 2025-26 (T-4), 2023-24 (T-4) ...
STV Line 3 EfW Haverton Hill Road Billingham Cleveland TS23 1PY (12 components)
• Combined Heat and Power Plant, St Marks Boiler House, capacity of generator 1.600MW. Although the supplier of the settled hh meter has provided their three peaks, we have used the combined peak of all the component units to determine the capacity of LDEC as a single CMU hence the connected capacity above being consistent with the three peaks of the combined units.
• Existing Energy from Waste Plant
• On-site existing CHP generating unit
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Stanlow Manufacturing Complex, Ellesmere Port, Cheshire, CH65 4HB (9 components)
• 2 x On-site turbo alternators
• 6 x On-site turbo alternators
• Power Recovery Train
Inactive • 2019-20 (T-1)
Loading map...
Showing 25 locations