CENTRICA BUSINESS SOLUTIONS UK OPTIMISATION LIMITED

26 unique locations (894 components) - Page 1 of 2

Active MW: 881.00 MW
Inactive MW: 4153.24 MW
Academy CHP, Lodge Avenue, Academy Way, Dagenham, London, RM8 2JA (14 components)
• 20 x 1mw gas generator units to be installed on designated land at Stratford Road - Connection offer is for 41.24mw which is split between CMUs - further detail in covering letter
• A as engine CHP site providing hot water to a local district heating network
• A gas engine CHP site providing hot water to a local district heating network
Active • 2028-29 (T-4), 2026-27 (T-4) ...
Aikengall IIa Wind Farm Innerwick EH42 1SG (4 components)

Existing Generation CMU - Onshore Wind. Connected at WesterDod 132kV substation.

Active • 2028-29 (T-4), 2025-26 (T-1) ...
Aston University, Aston Triangle, Birmingham, West Midlands, B4 7ET (57 components)
• 1MW Combined heat and Power Plant at Aston University. Total Capacity is 3.000MW, consisting of two generators - 2.000MW and 1.000MW
• 2MW Combined heat and Power Plant at Aston University. Total Capacity is 3.000MW, consisting of two generators - 2.000MW and 1.000MW
• Containerised high speed gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 9MW.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Byley Road, Byley, Middlewich, Cheshire, CW10 9NF (10 components)

Holford Gas Storage DSR

Active • 2028-29 (T-4), 2025-26 (T-1) ...
Carrington Power Station 132 Manchester Road Carrington Manchester M31 4AY United Kingdom (57 components)
• CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network
• The CMU component is a combined cycle gas turbine
• one CHP (1.9MW rating) in a horticulatural environment with no aux load
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Chichester Food Park, Bognor Rd, Chichester PO20 1NW, United Kingdom (99 components)
• Genset 2. ROCable hydro units within the BMU are not included in the CMU.
• Load Response - Automated Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
EDF Energy, Heysham 1 power station, Morecambe, Lancashire, LA3 2XH (33 components)
• EV charge station
• Heysham 1 Power Station CMU 1: [HY1124] T_HEYM11
• Heysham 1 Power Station CMU 2: [HY1224] T_HEYM12
Active • 2028-29 (T-4), 2026-27 (T-4) ...
EDF Energy, Heysham 2 power station, Morecambe, Lancashire, LA3 2XH (43 components)
• Heysham 2 Power Station CMU 7: [HY2723] T_HEYM27 + (50% x T_HEYM2-D)
• Heysham 2 Power Station CMU 7: [HY2724] T_HEYM27 + (50% x T_HEYM2-D)
• Heysham 2 Power Station CMU 8: [HY2824] T_HEYM28 + (50% x T_HEYM2-D)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
EDF Energy, Torness power station, Torness, Dunbar, East Lothian, EH42 1QU (34 components)
• Torness Power Station CMU 1: [TN1-23] T_TORN-1 + (50% x T_TORN-D)
• Torness Power Station CMU 1: [TN1-24] T_TORN-1 + (50% x T_TORN-D)
• Torness Power Station CMU 2: [TN2-24] T_TORN-2 + (50% x T_TORN-D)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Esso Refinery - Fawley - Southampton - Hampshire - SO45 1TX - United Kingdom (47 components)
• TG1B is part of the aggregated CMU EMD244, which is made up of 2 Generating Units of which TG1B is the larger. This Generating Unit is embedded in the 'E_FAWND' BMU and is part of the larger site inclusive BM Trading Unit, 'EPCO1'. All Components of 'EMD244' are located within the physical boundaries of the Esso Petroleum Company,Limited Oil Refinery at Esso Refinery - Fawley - Southampton - Hampshire - SO45 1TX - United Kingdom. TG1B is one of three power generation units on the site and is a Steam Turbine plant. It is connected to the Local Distribution Network (LDN) at 132kV level at the Fawley North Sub-Station (part of MSID 7095). Both Unit 3 and TG1B units share various auxiliary load equipment, the power for which is supplied from another part of the LDN Fawley North Sub-Station. Installation of separate metering for the auxiliary power for both TG1B and Unit 3 has been completed providing half hourly meters for the auxiliary load for the two units. Due to the large amount of common equipment shared by the two generation units (TG1B and Unit 3) we are unable to determine exactly what part of the auxiliary load is directly attributable to TG1B and thus for this CMU we have attributed the auxiliary load between the two. The auxiliary meters for Unit 3 and TG1B combined are: TR1MWI_MAIN, TR2MWI_MAIN and 26AMWI_MAIN. This entire metering configuration has been successfully assessed and tested.
• Unit 3 is part of the aggregated CMU EMD-19, which is made up of 2 Generating Units of which Unit 3 is the smallest. This Generating Unit is embedded in the ?E_FAWND? BMU and is part of the larger site inclusive BM Trading Unit, ?EPCO1?. All Components of ?EMD-19? are located within the physical boundaries of the Esso Petroleum Company,Limited Oil Refinery at Esso Refinery - Fawley - Southampton - Hampshire - SO45 1TX - United Kingdom. Unit 3 is one of three power generation units on site and is a Gas Turbine CHP plant. It is connected to the Local Distribution Network (LDN) at 132kV level at their Fawley North Sub-Station (part of MSID 7095). Both units share various auxiliary load equipment- the power for which is supplied from another part of the LDN Fawley North Sub-Station. Installation of separate metering for the auxiliary power for both TG1B and Unit 3 has been completed providing half hourly meters for the auxiliary load for the two units. Due to the large amount of common equipment shared by the two generation units (TG1B and Unit 3) we are unable to determine exactly what part of the auxiliary load is directly attributable to Unit 3 and thus for this CMU we have attributed the auxiliary load evenly about the three units - i.e. 7.954/3 = 2.6513% of MSID 7096, thus 2.024 MW. (NB. the rest of MSID 7095 is made up of one of our other components of our CMU i.e. TG1B). Due to the large amount of common equipment shared by the two generation units (TG1B and Unit 3) we are unable to determine exactly what part of the auxiliary load is directly attributable to TG1B and thus for this CMU we have attributed the auxiliary load between the two. The auxiliary meters for Unit 3 and TG1B combined are: TR1MWI_MAIN, TR2MWI_MAIN and 26AMWI_MAIN. This entire metering configuration has been successfully assessed and tested. Gross 3 HH av. peak generation from Unit 3 on separate days = 32.869 MW At these three HH times, aux load on Unit 3 = -1.468 MW Net generation from Unit 3 = 31.401 MW
• Unit 3 is part of the aggregated CMU EMD244, which is made up of 2 Generating Units of which Unit 3 is the smallest. This Generating Unit is embedded in the ?E_FAWND? BMU and is part of the larger site inclusive BM Trading Unit, ?EPCO1?. All Components of ?EMD244? are located within the physical boundaries of the Esso Petroleum Company,Limited Oil Refinery at Esso Refinery - Fawley - Southampton - Hampshire - SO45 1TX - United Kingdom. Unit 3 is one of three power generation units on site and is a Gas Turbine CHP plant. It is connected to the Local Distribution Network (LDN) at 132kV level at their Fawley North Sub-Station (part of MSID 7095). Both units share various auxiliary load equipment, the power for which is supplied from another part of the LDN Fawley North Sub-Station. Installation of separate metering for the auxiliary power for both TG1B and Unit 3 has been completed providing half hourly meters for the auxiliary load for the two units. Due to the large amount of common equipment shared by the two generation units (TG1B and Unit 3) we are unable to determine exactly what part of the auxiliary load is directly attributable to Unit 3 and thus for this CMU we have attributed the auxiliary load between the two. The auxiliary meters for Unit 3 and TG1B combined are: TR1MWI_MAIN, TR2MWI_MAIN and 26AMWI_MAIN. This entire metering configuration has been successfully assessed and tested.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Eurac - Dorset, 16 Mannings Heath Road Poole Dorset BH12 4NJ (42 components)
• A gas fuelled generating station.
• Component has yet to be procured.
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Kettle - Balmalcolm, Balmalcolm, Cupar, Fife KY15 7TJ (14 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
Larport Farm, Larport Lane, Dormington, Hereford, HR1 4EP (13 components)
• 19.500MW of battery storage located at Larport Farm, Larport Lane, Dormington, Hereford, HR1 4EP
• Battery storage located at Larport Farm, Larport Lane, Dormington, Hereford, HR1 4EP with a nameplate capacity of 19.500 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
• EnerG 1000 CHP
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Lawford Rd, Rugby CV21 2RY, United Kingdom (20 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
Millerhill Recycling & Energy Recovery Centre Whitehill Road DALKEITH EH22 1SX (11 components)
• FCC (E+M) Limited, 170kT Energy from Waste plant at Newcraighall with estimated 14 MW Generation Capacity. Auxilliary load is not included in connection capacity .i.e the export is net.
• FCC (E+M) Limited, New build 170kT Energy from Waste plant at Newcraighall with estimated 14 MW Generation Capacity. Auxilliary load is not included in connection capacity .i.e the export is net.
• New CMU ID due to updated Grid Connection Agreement FCC (E+M) Limited, 170kT Energy from Waste plant at Newcraighall with estimated 14 MW Generation Capacity. Auxilliary load is not included in connection capacity .i.e the export is net.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
MMDSS - Site 1, Flathouse Quay, Portsmouth PO2 7SP (14 components)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Active • 2028-29 (T-4), 2026-27 (T-4) ...
MMDSS - Site 2, Flathouse Quay, Portsmouth PO2 7SP (15 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
New Galloway, Castle Douglas, Kirkcudbrightshire, DG7 3SF, Scotland (43 components)
• Glenlee hydro power station - Unit 1, part of the Galloway hydroelectric scheme. The registered capacity of the Glenlee hydro power station is 30MVA or 24MW at 0.8PF and each of the 2 identical generating unit components at the station is 12MW.
• Glenlee hydro power station - Unit 1, part of the Galloway hydroelectric scheme. The registered capacity of the Glenlee hydro power station is 30MVA or 24MW at 0.8PF and each of the 2 identical generating unit components at the station is 12MW.
• Glenlee hydro power station - Unit 2, part of the Galloway hydroelectric scheme The registered capacity of the Glenlee hydro power station is 30MVA or 24MW at 0.8PF and each of the 2 identical generating unit components at the station is 12MW.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Plot 4 Thanet Earth, Barrow Man Road Birchington Kent CT7 0AX (11 components)
• Standby generation
• Two CHP gas engines in commercial horticultural environment with no auxilliary load
Active • 2028-29 (T-4), 2025-26 (T-4) ...
Rannoch Power Station, Rannoch, Perthshire, PH17 2QP (49 components)
• 1 x hydro turbine & synchronous generator
• 3 x 2MW Gas fuelled generator units to be installed on designated land within a compound at Belvedere Nurseries
• one CHP (1.9MW rating) in a horticulatural environment with no aux load
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Rotherdale Farm, Long Lane, Throckmorton, Worcestershire, United Kingdom, WR10 2JH (47 components)
• A gas engine CHP site providing hot water to a local district heating network
• One of three CHP in a horticultural environment
• One of three CHP in a horticultural environment.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
SIMEC Lochaber Power Lochaber Smelter North Road Fort William PH336TH (65 components)
• Hydro power turbine generator Unit 1 of the Lochaber Smelter hydro power plant, connected to a private network which in turn is connected to the local distribution network. The MPANs relate to the connection of the private network to the distribution network only. They will not be used for settlement purposes. Instead this CMU component will use bespoke net metering.
• Hydro power turbine generator Unit 4 of the Lochaber Smelter hydro power plant, connected to a private network which in turn is connected to the local distribution network. The MPANs relate to the connection of the private network to the distribution network only. They will not be used for settlement purposes. Instead this CMU component will use bespoke net metering.
• Hydro power turbine generator Unit 5 of the Lochaber Smelter hydro power plant, connected to a private network which in turn is connected to the local distribution network. The MPANs relate to the connection of the private network to the distribution network only. They will not be used for settlement purposes. Instead this CMU component will use bespoke net metering.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
South Cornelly Trading Estate, Porthcawl Road, Bridgend, CF33 4RE (23 components)
• 49.900MW/49.900MWh battery storage asset, 1 hour duration
• Gas fired CHP unit
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
Active • 2028-29 (T-4), 2025-26 (T-4) ...