CENTRICA BUSINESS SOLUTIONS UK OPTIMISATION LIMITED

44 unique locations (1201 components) - Page 1 of 2

Active MW: 881.00 MW
Inactive MW: 4153.24 MW
Woodhouse Energy Centre A. Pearson and Sons? Nursery Alderley Edge SK9 7UW (12 components)
• A gas engine CHP site providing hot water to a local district heating network, as well as providing some power direct via private wire to a local hotel
• Didcot 2 OCGT - Power factor used for conversion of kVA to MW is 1 . Fuel type is distillate MSID: 4032
• The CMU Component will have a connection capacity of 3.298MW net of 46kW auxiliary load. Gas-fired reciprocating engine will be the technology used.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
Winnington CHP Winnington Lane Winnington Northwich Cheshire CW8 4GX (47 components)
• Continuously operating, maximum output GE gas turbine driving a 47.020MVA Alstom generator at 0.85 power factor.
• Continuously operating, maximum output GE gas turbine driving a 47.020MWA Alstom generator at 0.85 power factor.
• Continuously operating, variable output Man Diesel Turbo single pass-out back pressure turbine driving a 19.300 MVA TD Power Systems generator at 0.85 power factor.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
Windsor Battery West, Millstream East, Maidenhead Road, Windsor, Berkshire, SL4 5GD. (9 components)
• Battery Storage
• Chemical manufacturer
• Glenlee hydro power station - Unit 2, part of the Galloway hydroelectric scheme The registered capacity of the Glenlee hydro power station is 30MVA or 24MW at 0.8PF and each of the 2 identical generating unit components at the station is 12MW.
Active • 2026-27 (T-4), 2025-26 (T-4) ...
Windsor Battery East, Millstream East, Maidenhead Road, Windsor, Berkshire, SL4 5GD. (10 components)
• Battery Storage
• Gas reciprocating engines
• Glenlee hydro power station - Unit 1, part of the Galloway hydroelectric scheme. The registered capacity of the Glenlee hydro power station is 30MVA or 24MW at 0.8PF and each of the 2 identical generating unit components at the station is 12MW.
Active • 2026-27 (T-4), 2025-26 (T-4) ...
Westexe, Tiverton, Devon, EX16 5LL (8 components)
• 2026 kW CHP unit
• The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system.
Active • 2026-27 (T-4), 2023-24 (T-1) ...
Weetabix, Station Rd, Burton Latimer, Kettering NN15 5JR, United Kingdom (27 components)
• Component has yet to be procured.
• EnerG 1000 CHP
• On-site CHP - existing generating unit
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Treviscoe Dryer, Little Treviscoe, St. Austell, PL26 7QN (18 components)
• E1000 CHP
• Gas CHP in St. Austell
• Gas fired CHP unit
Active • 2026-27 (T-4), 2025-26 (T-4) ...
Thirsk Factory, Dalton Airfield, Topcliffe, Thirsk, YO7 3HE. (10 components)
• 1.280MW CHP
• Aggregate CMU from Multiple Sources
• BM unit T_DINO-5 at Dinorwig Power Station (Pumped Storage)
Active • 2026-27 (T-4), 2025-26 (T-4) ...
The Canalside, Marsh Lane, off Showground Road, Bridgwater, Somerset, TA6 6LQ (20 components)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• New build windfarm.
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
STV Line 3 EfW Haverton Hill Road Billingham Cleveland TS23 1PY (12 components)
• Combined Heat and Power Plant, St Marks Boiler House, capacity of generator 1.600MW. Although the supplier of the settled hh meter has provided their three peaks, we have used the combined peak of all the component units to determine the capacity of LDEC as a single CMU hence the connected capacity above being consistent with the three peaks of the combined units.
• Existing Energy from Waste Plant
• On-site existing CHP generating unit
Active • 2028-29 (T-4), 2027-28 (T-4) ...
SIMEC Lochaber Power Lochaber Smelter North Road Fort William PH336TH (65 components)
• Hydro power turbine generator Unit 1 of the Lochaber Smelter hydro power plant, connected to a private network which in turn is connected to the local distribution network. The MPANs relate to the connection of the private network to the distribution network only. They will not be used for settlement purposes. Instead this CMU component will use bespoke net metering.
• Hydro power turbine generator Unit 3 of the Lochaber Smelter hydro power plant, connected to a private network which in turn is connected to the local distribution network. The MPANs relate to the connection of the private network to the distribution network only. They will not be used for settlement purposes. Instead this CMU component will use bespoke net metering.
• Hydro power turbine generator Unit 4 of the Lochaber Smelter hydro power plant, connected to a private network which in turn is connected to the local distribution network. The MPANs relate to the connection of the private network to the distribution network only. They will not be used for settlement purposes. Instead this CMU component will use bespoke net metering.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Saddlebow Industrial Estate, Poplar Avenue, King's Lynn PE34 3AL. (21 components)
• Power Station for Paper plant made up of 1x35MW Gas engine
• Power Station for Paper plant made up of 1x35MW Gas engine plus 1x12MW steam turbine
• The CMU component at Spark Street is an energy storage system comprised of Lithium-ion batteries. The system will have a 20 MW export capacity and an import capacity of 20 MW.
Active • 2026-27 (T-4), 2025-26 (T-4) ...
RWE Cogen UK (Hythe) Ltd Charleston Road Hardley Hythe Southampton SO45 3BP (5 components)
• Lithium Ion battery storage system capable of charging, storing and discharging electricity. Land at Stevensons Farm, Arterial Road, Nevendon, Essex SS14 3JH.
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• On-site existing CHP generating unit
Active • 2026-27 (T-4), 2024-25 (T-4) ...
Rannoch Power Station, Rannoch, Perthshire, PH17 2QP (49 components)
• 1 x hydro turbine & synchronous generator
• 3 x 2MW Gas fuelled generator units to be installed on designated land within a compound at Belvedere Nurseries
• one CHP (1.9MW rating) in a horticulatural environment with no aux load
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Power Station Road Isle of Grain Rochester ME3 0AR (69 components)
• Grain B CCGT Unit 6 Grain B power station provides heat to the Grain LNG regasification facility.
• OCGT from Grain U1. Fuel is Diesel as specified in BS EN590
• OCGT from Grain U4. Fuel is Diesel as specified in BS EN590
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Poplar Avenue, King' Lynn, PE34 3AL (9 components)

Palm Paper Limited operates a large paper making site in King's Lynn, Norfolk. The onsite industrial process is an energy intensive paper recycling and manufacturing plant. Palm Paper plans to …

Active • 2026-27 (T-4), 2025-26 (T-4) ...
8.57 MW
Monkerton Energy Centre, Tithebarn Lane, Exeter, Devon, EX1 3RH (8 components)
• A gas engine CHP site providing hot water to a local district heating network
• Battery storage
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
MGH Property Services Limited, Laurels Farm, Hatherton, Nantwich, CW5 7PW (16 components)
• A 6.000MW Battery Energy Storage System to be installed at Gatwick Electric Forecourt
• Didcot 3 OCGT - Power factor used for conversion of kVA to MW is 1 . Fuel type is distillate MSID: 4032
• Nantwich Existing Site CHP
Active • 2028-29 (T-4), 2026-27 (T-4) ...
Medway Power Station, Rochester, Medway, ME3 0AG (29 components)
• A gas fuelled generating station.
• Genset 3
• Medway CCGT
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Littleton Pastures Solar, Lakeshill Road, Worcestershire, WR118TS (3 components)
• Office site with behind the meter bio-diesel generation - offsetting site load and exporting surplus
• The CMU is a solar photovoltaic System with a planned 31MW maximum installation, consisting of solar panels. With a grid export capacity of 22MVA..
Active • 2027-28 (T-4), 2026-27 (T-4) ...
Larport Farm, Larport Lane, Dormington, Hereford, HR1 4EP (13 components)
• 19.500MW of battery storage located at Larport Farm, Larport Lane, Dormington, Hereford, HR1 4EP
• Battery storage located at Larport Farm, Larport Lane, Dormington, Hereford, HR1 4EP with a nameplate capacity of 19.500 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
• EnerG 1000 CHP
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Larkfield Industrial Estate, 99 Earnhill Road, Greenock, PA16 0EQ (5 components)
• 1.9 MW Gas gen ENER-G 1999
• bus depot
Active • 2026-27 (T-4), 2023-24 (T-1) ...