Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

CENTRICA BUSINESS SOLUTIONS UK OPTIMISATION LIMITED

29 unique locations (223 components) - Page 1 of 2

Active MW: 881.00 MW
Inactive MW: 4153.24 MW
Barrack Road, Exeter, EX2 5DW. (7 components)

1.521 MW CHP unit

Active • 2026-27 (T-4), 2024-25 (T-4) ...
Bristol Royal Infirmary, Marlborough Hill, Bristol, BS2 8HW (12 components)
• 1 * 1.7MW diesel reciporcating engine
• 1 * 1.7MW diesel reciprocating engine
Active • 2026-27 (T-4), 2025-26 (T-4) ...
British Gas, 4 Marine Drive, Edinburgh, EH5 1SG (2 components)

Office site with behind the meter bio-diesel generation - offsetting site load and exporting surplus

Active • 2026-27 (T-4), 2025-26 (T-4)
3.08 MW
Britned Convertor Station, Gate C, Grain Road, Isle of Grain, Kent, ME3 0AE (9 components)
• BritNed is a 1200MW (TEC) electricity interconnector connecting the electricity transmission systems in the Netherlands and Great Britain.
• BritNed is a 1320MW (CEC) electricity interconnector connecting the electricity transmission systems in the Netherlands and Great Britain.
• BritNed is a 1320MW (TEC) electricity interconnector connecting the electricity transmission systems in the Netherlands and GB.
• ... and 1 more unique description
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Denison road, Selby, North Yorkshire, YO8 8AN. (12 components)

Gas Turbine Cogeneration Unit GT3

Active • 2026-27 (T-4), 2025-26 (T-4) ...
Hatfield Grid Station, Dellsome Lane, Colney Heath, St. Albans, AL4 0QT (2 components)

CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid

Active • 2026-27 (T-4), 2025-26 (T-4)
Land off Kibworth Road, Moss Farm, Kibworth Beauchamp, Leicester, LE8 0HJ (6 components)
• 2.5MW gas fired peaking power plant
• 5MW gas fired peaking power plant
• Containerised Reciprocating Gas Engines
Active • 2026-27 (T-4), 2025-26 (T-4) ...
Larport Farm, Larport Lane, Dormington, Hereford, HR1 4EP (11 components)
• 19.500MW of battery storage located at Larport Farm, Larport Lane, Dormington, Hereford, HR1 4EP
• Battery storage located at Larport Farm, Larport Lane, Dormington, Hereford, HR1 4EP with a nameplate capacity of 19.500 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Littleton Pastures Solar, Lakeshill Road, Worcestershire, WR118TS (3 components)

The CMU is a solar photovoltaic System with a planned 31MW maximum installation, consisting of solar panels. With a grid export capacity of 22MVA..

Active • 2027-28 (T-4), 2026-27 (T-4)
Monkerton Energy Centre, Tithebarn Lane, Exeter, Devon, EX1 3RH (8 components)

A gas engine CHP site providing hot water to a local district heating network

Active • 2028-29 (T-4), 2027-28 (T-4) ...
Olympia Mills, Barlby Rd, Selby YO8 5AF multisite (5 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2026-27 (T-4), 2023-24 (T-1)
Thirsk Factory, Dalton Airfield, Topcliffe, Thirsk, YO7 3HE. (8 components)

1.280MW CHP

Active • 2026-27 (T-4), 2025-26 (T-4) ...
Loading map...
Showing 25 locations