CENTRICA BUSINESS SOLUTIONS UK OPTIMISATION LIMITED

7 unique locations (138 components)

Active MW: 881.00 MW
Inactive MW: 4153.24 MW
1 Rivington Rd, Preston Brook, Runcorn WA7 3DP, United Kingdom (13 components)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• On-site existing CHP generating unit
• The proposed power plant would consist of a number new highly efficient gas fired generating units plus ancillary equipment. Each genset is based on advanced reciprocating engine technology.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
British Steel Limited, Administration Building, Brigg Road, Scunthorpe, North Lincolnshire, DN16 1XA (46 components)
• Hamms Hall - Existing Site CHP
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• existing CHP on site
Active • 2028-29 (T-4), 2027-28 (T-4) ...
International Conference Centre, Birmingham, B1 2EA (13 components)
• 1.6MW Combined Heat and Power at International Conference Centre
• CHP Unit
• On-site existing CHP generating unit
Active • 2028-29 (T-4), 2025-26 (T-1) ...
MGH Property Services Limited, Laurels Farm, Hatherton, Nantwich, CW5 7PW (16 components)
• A 6.000MW Battery Energy Storage System to be installed at Gatwick Electric Forecourt
• Didcot 3 OCGT - Power factor used for conversion of kVA to MW is 1 . Fuel type is distillate MSID: 4032
• Nantwich Existing Site CHP
Active • 2028-29 (T-4), 2026-27 (T-4) ...
North Tawton, Sampford Courtenay, West Devon, Devon, England, EX20 2DA, United Kingdom (4 components)
• 30MW/30MWh one hour battery
• Hydro power turbine generator Unit 1 of the Lochaber Smelter hydro power plant, connected to a private network which in turn is connected to the local distribution network. The MPANs relate to the connection of the private network to the distribution network only. They will not be used for settlement purposes. Instead this CMU component will use bespoke net metering.
• On-site existing CHP generating unit
Active • 2025-26 (T-1), 2024-25 (T-1) ...
Solenis, Cleckheaton Road, Low Moor, Bradford, United Kingdom, BD12 0JZ (19 components)
• Distribution Centre with behind the meter back up generation
• Gas Turbine CHP unit
• Office site with behind the meter generation
Active • 2025-26 (T-1), 2024-25 (T-4) ...
Weetabix, Station Rd, Burton Latimer, Kettering NN15 5JR, United Kingdom (27 components)
• Component has yet to be procured.
• EnerG 1000 CHP
• On-site CHP - existing generating unit
Active • 2028-29 (T-4), 2027-28 (T-4) ...