CENTRICA BUSINESS SOLUTIONS UK OPTIMISATION LIMITED

31 unique locations (894 components) - Page 1 of 2

Active MW: 588.77 MW
Inactive MW: 4445.47 MW
1 Waterfront Avenue, Edinburgh, EH5 1SG (27 components)
• Office site with behind the meter back up generation
• Office site with behind the meter generation
• Office site with behind the meter generation.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
2600 John Smith Drive, Oxford, OX4 2JY (37 components)

Office site with behind the meter bio-diesel generation - offsetting site load and exporting surplus

Active • 2024-25 (T-4), 2023-24 (T-4) ...
Bones lane, Cheddleton, Leek, Staffordshire, ST13 7BT (9 components)

1.9 MW Gas gen ENER-G 1999

Active • 2025-26 (T-4), 2024-25 (T-4) ...
British Gas, Bothwell Road, Uddingston, Glasgow, G71 7TW (35 components)

Office site with behind the meter bio-diesel generation - offsetting site load and exporting surplus

Active • 2024-25 (T-4), 2023-24 (T-4) ...
British Gas, New Bridge Ln, Stockport, SK1 2GT (14 components)

Office site with behind the meter bio-diesel generation - offsetting site load and exporting surplus

Active • 2025-26 (T-4), 2024-25 (T-4) ...
3.08 MW
Chichester Food Park, Bognor Rd, Chichester PO20 1NW, United Kingdom (73 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
Component has yet to be procured. (211 components)

Component has yet to be procured.

Active • 2024-25 (T-4), 2023-24 (T-4) ...
Denison road, Selby, North Yorkshire, YO8 8AN. (12 components)

Gas Turbine Cogeneration Unit GT3

Active • 2026-27 (T-4), 2025-26 (T-4) ...
Denison Road, Selby, North Yorkshire YO8 8AN (23 components)
• Gas Turbine Cogeneration Unit
• One 8 MWe Gas Turbine Cogeneration Unit (GT2)
Active • 2026-27 (T-4), 2024-25 (T-4) ...
Fasnakyle Power Station, Cannich, Beauly, IV4 7NB (29 components)
• Generating Unit 1
• Generating Unit 2
• Generating unit 3.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Harmire Road, Barnard Castle, County Durham, DL12 8D (13 components)

On-site existing CHP generating unit

Active • 2024-25 (T-4), 2023-24 (T-4) ...
land at Hoon Hay Farm, Marston Lane, Hatton, Derbyshire, DE65 5EA (1 component)

gas powered generator to be installed on designated land within a manufacturing compound at the Hoon Hay Farm.

Active • 2024-25 (T-4)
Long Lane, Westhoughton, Bolton, Lancashire BL5 3QR (5 components)

Energy facility comprising of reciprocating engine sets and ancillary equipment.

Active • 2024-25 (T-4), 2023-24 (T-4) ...
Maidenhead Road, Windsor, SL4 5GD (13 components)
• Battery Storage
• Battery storage
• Battery strorage unit
Active • 2024-25 (T-4), 2023-24 (T-4) ...
New Galloway, Castle Douglas, Kirkcudbrightshire, DG7 3SF, Scotland (39 components)
• Glenlee hydro power station - Unit 1, part of the Galloway hydroelectric scheme. The registered capacity of the Glenlee hydro power station is 30MVA or 24MW at 0.8PF and each of the 2 identical generating unit components at the station is 12MW.
• Glenlee hydro power station - Unit 1, part of the Galloway hydroelectric scheme. The registered capacity of the Glenlee hydro power station is 30MVA or 24MW at 0.8PF and each of the 2 identical generating unit components at the station is 12MW.
• Glenlee hydro power station - Unit 2, part of the Galloway hydroelectric scheme The registered capacity of the Glenlee hydro power station is 30MVA or 24MW at 0.8PF and each of the 2 identical generating unit components at the station is 12MW.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
North Avenue, Marston Green, Birmingham, B40 1NT (22 components)
• CHP Unit 850kWe proposed to be installed in Hall 6-8 at NEC site
• Proposed CHP Unit 850kWe to be installed in Hall 6-8 at NEC site
• Proposed Gas Generation units at 1013kWe
Active • 2024-25 (T-4), 2023-24 (T-4) ...
2.92 MW
North Avenue, Marston Green, Birmingham, B40 1NT. (11 components)

Gas Generator - ENER-G 1521 - proposed to be installed on land to the north-east elevation of Hall 5 at the NEC Site.

Active • 2024-25 (T-4), 2023-24 (T-4) ...
Park Road, Ware. Hertfordshire, SG12 0DP (35 components)

On-site existing CHP generating unit

Active • 2024-25 (T-4), 2023-24 (T-4) ...
Poplar Avenue, King' Lynn, PE34 3AL (14 components)

Palm Paper Limited operates a large paper making site in King's Lynn, Norfolk. The onsite industrial process is an energy intensive paper recycling and manufacturing plant. Palm Paper plans to …

Active • 2026-27 (T-4), 2025-26 (T-4) ...
8.57 MW
Loading map...
Showing 25 locations