CENTRICA BUSINESS SOLUTIONS UK OPTIMISATION LIMITED

5 unique locations (71 components)

Active MW: 0.00 MW
Inactive MW: 0.00 MW
North Avenue, Marston Green, Birmingham, B40 1NT. (18 components)

Gas Generator - ENER-G 1521 - proposed to be installed on land to the north-east elevation of Hall 5 at the NEC Site. (3)

Active • 2024-25 (T-4), 2023-24 (T-4) ...
North Avenue, Marston Green, Birmingham, B40 1NT (18 components)
• CHP Unit 850kWe proposed to be installed in Hall 6-8 at NEC site
• Gas Generation units at 1013kWe
• Gas Generator - ENER-G 1521 - proposed to be installed on land to the north-east elevation of Hall 5 at the NEC Site.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
National Distribution Centre, Barnsdale Way, Grove Park, Leicester, LE19 1SU (6 components)

Distribution Centre with behind the meter back-up generation.

DSR GB GAS HOLDINGS LIMITED Proven DSR CMU CENEST CENEST1 LE19
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
British Gas, New Bridge Ln, Stockport, SK1 2HQ (12 components)

Office site with behind the meter bio-diesel generation - offsetting site load and exporting surplus

DSR GB GAS HOLDINGS LIMITED Proven DSR CMU CENEST CENEST1 +3 more SK1
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
195 Aylesone Rd, Leicester LE2 7QJ (17 components)

Office site with behind the meter bio-diesel generation - offsetting site load and exporting surplus

DSR GB GAS HOLDINGS LIMITED Proven DSR CMU CENEST CENEST1 +6 more LE2
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Loading map...
Showing 5 locations