CENTRICA BUSINESS SOLUTIONS UK OPTIMISATION LIMITED

45 unique locations (771 components) - Page 1 of 2

Active MW: 881.00 MW
Inactive MW: 4153.24 MW
195 Aylesone Rd, Leicester LE2 7QJ (29 components)

Office site with behind the meter bio-diesel generation - offsetting site load and exporting surplus

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
1 Waterfront Avenue, Edinburgh, EH5 1SG (25 components)
• Glenhove Water Pumping Station
• Office site with behind the meter generation
• On-site existing CHP generating unit
Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
2600 John Smith Drive, Oxford, OX4 2JY (35 components)
• Generating Unit 1
• Office site with behind the meter bio-diesel generation - offsetting site load and exporting surplus
• Operational gas reciprocating engine.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
97 Talbot Road, Stretford, Manchester, Lancashire, M16 0TW (5 components)
• Offsite with behind the meter generation
• On-site existing CHP generating unit
Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
Asda Witham Highfields Road, Benfield Way Lakes Road Braintree CM7 3YS (10 components)
• CHP unit
• Load reduction.
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Active • 2026-27 (T-4), 2025-26 (T-4) ...
BOC Brinsworth, Bawtry Road, Brinsworth, Rotherham, S60 5NT (22 components)
• BtM storage providing standby capacity
• Industrial Gases production processes. DSR delivered through process interruption
• Industrial Gases production site. DSR provided through process interruption.
Active • 2025-26 (T-1), 2024-25 (T-1) ...
Bott Lane, Lye, Stourbridge, West Midlands DY9 7AW (10 components)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• Office site with behind the meter generation
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Bristol Royal Infirmary, Marlborough Hill, Bristol, BS2 8HW (12 components)
• 1 * 1.7MW diesel reciporcating engine
• 1 * 1.7MW diesel reciprocating engine
• Peak power plant
Active • 2025-26 (T-4), 2023-24 (T-1) ...
British Gas, Bothwell Road, Uddingston, Glasgow, G71 7TW (42 components)
• BM unit T_DINO-1 at Dinorwig Power Station (Pumped Storage)
• Office site with behind the meter bio-diesel generation - offsetting site load and exporting surplus
• On-site existing CHP generating unit
Active • 2027-28 (T-4), 2024-25 (T-4) ...
British Gas, Housesteads, Off Stockport Road, Hattersley, SK14 3QU (5 components)
• Office site with behind the meter back-up generation.
• On-site existing CHP generating unit
Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
British Gas, New Bridge Ln, Stockport, SK1 2GT (15 components)
• A generating station consisting of multiple reciprocating engines and alternators located on a single site.
• Office site with behind the meter bio-diesel generation - offsetting site load and exporting surplus
Active • 2025-26 (T-4), 2024-25 (T-4) ...
3.08 MW
BSB Transport Ltd Trondheim Way, Redwood Park Estate, Stallingborough, Grimsby, North East Lincolnshire, DN41 8FD. (5 components)
• 1.9 MW Gas gen ENER-G 1999
• A Battery Energy Storage System.
• Hunterston B Power Station CMU 7: [HU7-19] T_HUNB-7 + (50% x T_HUNB-D) + (50% x E_HUNB-11S)
Active • 2025-26 (T-1), 2024-25 (T-1) ...
Cardiff Road, Barry, Vale of Glamorgsan, CF63 2YL (34 components)
• DSR components to be assigned prior to the start of the Delivery Year.
• Gas Turbine CHP GT001B
• Steam Turbine CHP
Active • 2026-27 (T-4), 2025-26 (T-4) ...
Centrica Brigg Power Station, Scawby Brook, Brigg DN20 9LT. (17 components)

Centrica Brigg Power Station is an Open Cycle Gas Turbine (OCGT) electricity generating station.

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Centrica Peterborough Power Station, Storeys Bar Road, Peterborough, PE1 5NT. (26 components)
• 1 x hydro turbine & synchronous generator
• 4MW battery co-located with a solar farm
• Centrica Peterborough Power Station (PPS) is an Open Cycle Gas Turbine (OCGT) electricity generating station.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Eastfield Road, North Killingholme, Immingham, North Lincolnshire, DN40 3LW (79 components)
• CMU consisting of multiple gas reciprocating engines and alternators
• Energy facility comprising of reciprocating engine sets.
• TBC
Active • 2026-27 (T-4), 2024-25 (T-4) ...
Energy Centre Westfield London, Ariel Way, White City, London, W12 7GF (32 components)
• A gas engine CHP site providing electricity & heat to the associated development
• On-site CHP - existing generating unit Pond Street London OS Grid Reference: TQ 272 854 NW3 2QG
• On-site CHP - existing generating unit The Ridgeway Enfield, Middlesex EN2 8JL OS Grid Reference: TQ 312 980
Active • 2025-26 (T-4), 2024-25 (T-4) ...
EnviroWales - Ebbw Vale - Site 1, Plateaux 1 & 2 Rassau Industrial Estate Ebbw Vale Blaenau Gwent NP23 5SD (16 components)
• 48MW Battery Energy Storage facility
• Gas peaking reciprocating engine
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2028-29 (T-4), 2024-25 (T-4) ...
Gunnels Wood Road, Stevenage, SG1 2NY, United Kingdom (25 components)
• CMU consisting of multiple reciprocating engines and alternators
• New build power station comprised of multiple reciprocating engines.
• On-site existing CHP generating unit
Active • 2024-25 (T-4), 2022-23 (T-4) ...
Harmire Road, Barnard Castle, County Durham, DL12 8DT (22 components)
• Component has yet to be procured.
• Load reduction on site supported by non-exporting standby generation.
• On-site existing CHP generating unit
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...