CENTRICA BUSINESS SOLUTIONS UK OPTIMISATION LIMITED

6 unique locations (73 components)

Active MW: 881.00 MW
Inactive MW: 4153.24 MW
Bristol Royal Infirmary, Marlborough Hill, Bristol, BS2 8HW (14 components)
• 1 * 1.7MW diesel reciporcating engine
• 1 * 1.7MW diesel reciprocating engine
• on site generating CMU
Active • 2027-28 (T-4), 2026-27 (T-4) ...
Bristol Royal Infirmary, Marlborough Hill, Bristol, BS2 8HW (12 components)
• 1 * 1.7MW diesel reciporcating engine
• 1 * 1.7MW diesel reciprocating engine
• Peak power plant
Active • 2025-26 (T-4), 2023-24 (T-1) ...
Bristol Royal Infirmary, Marlborough Hill, Bristol, BS2 8HW (13 components)
• 1 * 1.7MW diesel reciporcating engine
• 1 * 1.7MW diesel reciprocating engine
• New Build Combined Cycle Gas Turbine plant to be installed on designated land at the Drax Power Station site
Active • 2026-27 (T-4), 2025-26 (T-4) ...
Thatcham Grid Substation, Piper's Lane, Off Station Road, Thatcham, RG19 4NA (15 components)
• 6 x reciprocating engines
• Auxiliary supply is subtracted prior to Bespoke Metering point MSID - NIA M1 ? 18042602
• Distribution Centre with behind the meter back-up generation.
Active • 2025-26 (T-4), 2023-24 (T-4) ...
Unit 3015 Western Approach Distribution Park Govier Way Bristol BS35 4GG (8 components)
• 8 x 1mw gas generator units to be installed on designated land at Steventon Road - Connection offer is for 13mw which is split between CMUs - further detail in covering letter
• E1000 CHP unit
Active • 2025-26 (T-4), 2023-24 (T-1) ...
Loading map...
Showing 6 locations