CENTRICA BUSINESS SOLUTIONS UK OPTIMISATION LIMITED

16 unique locations (223 components)

Active MW: 881.00 MW
Inactive MW: 4153.24 MW
Darent Valley Hospital, Darenth Wood Rd, Dartford, DA2 8DA (7 components)
• 1280 KWe Combined Heat and Power unit.
• MTU - 8V400064 1.013MW
Active • 2024-25 (T-4), 2024-25 (T-1) ...
Denison Road, Selby, North Yorkshire YO8 8AN (19 components)
• Gas Turbine Cogeneration Unit
• One 8 MWe Gas Turbine Cogeneration Unit (GT2)
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Gunnels Wood Road, Stevenage, SG1 2NY, United Kingdom (25 components)
• CMU consisting of multiple reciprocating engines and alternators
• New build power station comprised of multiple reciprocating engines.
• On-site existing CHP generating unit
Active • 2024-25 (T-4), 2022-23 (T-4) ...
Harmire Road, Barnard Castle, County Durham, DL12 8D (10 components)
• Distribution centre with behind the meter back up generation
• Load reduction on site supported by non-exporting standby generation.
• On-site existing CHP generating unit
Inactive • 2023-24 (T-4), 2021-22 (T-4) ...
Harmire Road, Barnard Castle, County Durham, DL12 8DT (22 components)
• Component has yet to be procured.
• Load reduction on site supported by non-exporting standby generation.
• On-site existing CHP generating unit
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
North Avenue, Marston Green, Birmingham, B40 1NT (19 components)
• CHP Unit 850kWe proposed to be installed in Hall 6-8 at NEC site
• Proposed CHP Unit 850kWe to be installed in Hall 6-8 at NEC site
• Proposed Gas Generation units at 1013kWe
Active • 2024-25 (T-4), 2023-24 (T-4) ...
2.92 MW
Southdownview Way, Worthing, West Sussex, BN14 8QH (14 components)
• CHP and autogeneration
• DSR component providing load turn-down at a paper product manufacturing site
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Unit 3015 Western Approach Distribution Park Govier Way Bristol BS35 4GG (8 components)
• 8 x 1mw gas generator units to be installed on designated land at Steventon Road - Connection offer is for 13mw which is split between CMUs - further detail in covering letter
• E1000 CHP unit
Active • 2025-26 (T-4), 2023-24 (T-1) ...
Waterswallows, Tunstead Quarry, Tunstead, Buxton, Derbyshire SK17 8TG (23 components)
• On-site existing CHP generating unit
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Inactive • 2023-24 (T-1), 2022-23 (T-4) ...