CENTRICA BUSINESS SOLUTIONS UK OPTIMISATION LIMITED

7 unique locations (90 components)

Active MW: 881.00 MW
Inactive MW: 4153.24 MW
1 Waterfront Avenue, Edinburgh, EH5 1SG (25 components)
• Glenhove Water Pumping Station
• Office site with behind the meter generation
• On-site existing CHP generating unit
Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
Harmire Road, Barnard Castle, County Durham, DL12 8D (10 components)
• Distribution centre with behind the meter back up generation
• Load reduction on site supported by non-exporting standby generation.
• On-site existing CHP generating unit
Inactive • 2023-24 (T-4), 2021-22 (T-4) ...
International Conference Centre, Birmingham, B1 2EA (13 components)
• 1.6MW Combined Heat and Power at International Conference Centre
• CHP Unit
• On-site existing CHP generating unit
Active • 2028-29 (T-4), 2025-26 (T-1) ...
Land adjacent to the SW of Glassenbury BESS, Glassenbury Road, Cranbrook, Kent, TN17 2QL (2 components)
• A new build storage station using batteries
• Steam Driven Turbo Alternator 8G4 7MWe (derated to 4 MWe for mechanical reasons)
Inactive • 2023-24 (T-4), 2020-21 (T-4)
Land at Fawley , Northern Access Road, Southampton, SO45 1BD  (7 components)
• CMU Component is 500kVA reciprocating diesel engine.
• Gas Turbine CHP GT001B
• Taylor's Lane OCGT GT Unit 3 Unit fuelled by Gas Oil as specified in BS 2869 Class A2
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Waterswallows, Tunstead Quarry, Tunstead, Buxton, Derbyshire SK17 8TG (23 components)
• On-site existing CHP generating unit
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Inactive • 2023-24 (T-1), 2022-23 (T-4) ...
Loading map...
Showing 7 locations