Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

CENTRICA BUSINESS SOLUTIONS UK OPTIMISATION LIMITED

38 unique locations (420 components) - Page 1 of 2

Active MW: 881.00 MW
Inactive MW: 4153.24 MW
Willows, Drayton Manor Farm, Alcester Road, Stratford-Upon-Avon, CV37 9RG (7 components)
• 1000kW/1200kWh Lithium Ion Battery
• 1MW Lithium Ion Battery Storage unit
• Gas fired reciprocating engines
Inactive • 2022-23 (T-3), 2020-21 (T-4) ...
West Burton Power Station, West Burton, Retford, Nottinghamshire, DN22 9BL (5 components)
• West Burton B Power Station CMU 4 [WB4C16] (New build battery storage project)
• West Burton B Power Station CMU 4 [WB4C17] (New build battery storage project)
Inactive • 2020-21 (T-4), 2018-19 (T-1)
Warsop Energy Park, Carter Lane, Warsop Vale, NG20 8XG (28 components)
• A new build gas fuelled power generating unit comprising multiple reciprocating engines.
• BM unit T_DINO-4 at Dinorwig Power Station (Pumped Storage)
• Gas reciprocating engines
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
TWIN OAKS FARM LAND TO THE EAST OF YELT FARM LOWER STREET DOVERIDGE DE6 5JW (6 components)
• NEW BUILD DIESEL GENERATION STATION
• NEW BUILD GAS FUELLED GENERATING STATION
• NEW BUILD GAS GENERATION STATION
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
The Leys, Drayton Manor Farm, Alcester Road, Stratford-Upon-Avon, CV37 9RG (9 components)
• 0.8 MW of demand reduction
• 800kW/1100kWh Lithium Ion Battery
Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
Tees Valley Nursery, The Moat, Belasis Hall, TS23 4ED, UK (2 components)

The CMU TEES16 consists of two identical components. TEES16-1 is one gas-fired Jenbacher CHP engine with a generation capacity of 3.352MW. The total CMU generation capacity is declared 6.704MW. The …

Inactive • 2020-21 (T-4), 2017-18 (T-1)
SWEB Estate, Romney Avenue, Lockleaze, Bristol, BS7 9ST (8 components)
• Gas and/or diesel reciprocating engines.
• battery storage
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Sloy Power Station, Inveruglas, By Arrochar, Argyll, G83 7DP (22 components)
• Energy facility comprising of battery energy storage sets and ancillary equipment.
• Genset 3
• The CMU component comprises of three 2MW Reciprocating Gas Engines
Active • 2026-27 (T-4), 2024-25 (T-4) ...
Shirebrook 2 Acreage Lane Shirebrook Nottinghamshire NG20 8RN (8 components)
• 1 x jenbacher JGS616 GS
• Gas reciprocating engines
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Poplars, Drayton Manor Farm, Alcester Road, Stratford-Upon-Avon, CV37 9RG (10 components)
• 1 MW of demand reduction
• 1000kW/1200kWh Lithium Ion Battery
• Gas fired reciprocating engines
Inactive • 2022-23 (T-3), 2020-21 (T-4) ...
Pines way, Station Rd, Stalbridge, Sturminster Newton DT10 2RN, United Kingdom (13 components)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• N/A
• To be confirmed
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Ongar Landfill Site Mill Lane High Ongar Essex CM5 9RG (6 components)
• 2 gas reciprocating engines rated at approximately 1MW each. All associated gas delivery equipment and switchgear is included. The generating units are connected top the distribution network.
• Gas fired reciprocating engine(s)
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
North Avenue, Marston Green, Birmingham, B40 1NT. (12 components)
• Gas Generator - ENER-G 1521 - proposed to be installed on land to the north-east elevation of Hall 5 at the NEC Site.
• Import/Export metering with diesel generation at a retail store
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Lucern, Drayton Manor Farm, Alcester Road, Stratford-Upon-Avon, CV37 9RG (5 components)

1000kW/1200kWh Lithium Ion Battery

Inactive • 2020-21 (T-4), 2017-18 (T-1)
Liberty Lochaber Smelter, Fort William, Scotland PH33 6TH (53 components)
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines.
• CHP engine in a horticultural environment, natural gas, no aux load
• Existing CCGT Unit
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Land to the west of Old Forge Dr, Redditch B98 7SY, UK (7 components)
• New build gas generator
• The CMU component at the Ipsley Battery Storage Facility will be an energy storage system comprised of batteries and will have import and export capacity of 4MW each.
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Land Adjacent To 9 Neatscourt Cottages, Queenborough Road, Halfway Kent ME12 3RJ (8 components)
• 16 MW power plant comprising 8 x 2MW gas reciprocating engines. Power plant will be connected to the local distribution network and local gas network.
• The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system.
Inactive • 2020-21 (T-4)
Kingsnorth. Hoo. St Werburgh. Rochester. Kent. ME3 9TX (12 components)
• Combined Cycle Gas Turbine plant
• Energy Centre comprising of lean burn acoustically treated natural gas reciprocating engines
• New build Combined Cycle Gas Turbine plant
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Hem Heath CMM Generation, Sir Stanley Mathews Way, Trentham Lakes, Trentham, Stoke on Trent ST4 4DD (6 components)
• Energy From Waste facility
• Gas reciprocating engines
• Recprocating diesel engine as illustrated with the attached metered line diagram and CMU outline plan. Parascitic load will be 75KW
Inactive • 2023-24 (T-4), 2021-22 (T-4) ...
Harmire Road, Barnard Castle, County Durham, DL12 8D (10 components)
• Distribution centre with behind the meter back up generation
• Load reduction on site supported by non-exporting standby generation.
• On-site existing CHP generating unit
Inactive • 2023-24 (T-4), 2021-22 (T-4) ...
Greenfield Road, Bedford MK45 5JD (2 components)

gas fired reciprocating engines

Inactive • 2020-21 (T-4)
Great Yarmouth Power Station South Denes Road Great Yarmouth Norfolk NR30 3PY (6 components)
• Great Yarmouth 1 - CCGT
• Great Yarmouth 1 - CCGT MSID: 7111
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Errochty Power Station, Tummel Bridge, by Pitlochry, Perthshire, PH16 5DF (23 components)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• N/A
• This is a long standing existing Gas Engine unit on land within a manufacturing site.
Active • 2027-28 (T-4), 2023-24 (T-4) ...
DS Smith Paper Limited, Kemsley Paper Mill, Sittingbourne, Kent, ME10 2TD (30 components)
• A 49MW New Build Battery Storage Site.
• A gas turbine generating unit, part of a CHP which supplies heat & power to a paper mill
• A steam turbine generating unit, part of a CHP which supplies heat & power to a paper mill
Inactive • 2023-24 (T-1), 2022-23 (T-4) ...
Cottam EDF Energy (Cottam Power) Ltd, Outgang Lane, Cottam, Retford, DN22 0NP (8 components)
• CMU consisting of multiple reciprocating engines and alternators
• Cottam Power Station CMU 1 CT1-17 = 100% (T_COTPS-1) + 25% (T_COTPS-S)
• Cottam Power Station CMU 3 CT3-17 = 100% (T_COTPS-3) + 25% (T_COTPS-S)
Inactive • 2023-24 (T-4), 2021-22 (T-4) ...
Loading map...
Showing 25 locations