Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

CENTRICA BUSINESS SOLUTIONS UK OPTIMISATION LIMITED

9 unique locations (120 components)

Active MW: 881.00 MW
Inactive MW: 4153.24 MW
Waterswallows, Tunstead Quarry, Tunstead, Buxton, Derbyshire SK17 8TG (23 components)
• On-site existing CHP generating unit
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Inactive • 2023-24 (T-1), 2022-23 (T-4) ...
North Avenue, Marston Green, Birmingham, B40 1NT. (12 components)
• Gas Generator - ENER-G 1521 - proposed to be installed on land to the north-east elevation of Hall 5 at the NEC Site.
• Import/Export metering with diesel generation at a retail store
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Marks & Spencer - Stockley Park, 3 Longwalk Road, Stockley Park, Uxbridge, UB11 1AW (10 components)
• Glenlee hydro power station - Unit 2, part of the Galloway hydroelectric scheme The registered capacity of the Glenlee hydro power station is 30MVA or 24MW at 0.8PF and each of the 2 identical generating unit components at the station is 12MW.
• Load reduction
• Office site with behind the meter bio-diesel generation - offsetting site load and exporting surplus
Active • 2025-26 (T-4), 2023-24 (T-4) ...
Liberty Steel Newport, Coroporation Road, Newport, NP19 4XE (9 components)
• 6 diesel generators built on an existing industrial site although alternative fuel sources are also being considered.
• 6 diesel generators built on an existing industrial site, although alternative fuels are being tested before a final decision is made.
• Office site with behind the meter bio-diesel generation - offsetting site load and exporting surplus
Inactive • 2023-24 (T-4), 2020-21 (T-4) ...
Land off Kibworth Road, Moss Farm, Kibworth Beauchamp, Leicester, LE8 0HJ (4 components)
• Component has yet to be procured
• Containerised Reciprocating Gas Engines
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2025-26 (T-4), 2024-25 (T-1) ...
Land at Claredown Farm Hickford Hill Belchamp St Paul Sudbury Essex CO10 7DW (7 components)
• 1 x hydro turbine & synchronous generator
• 20 MW of DSR
• One 8 MWe Gas Turbine Cogeneration Unit (GT2)
Inactive • 2023-24 (T-4), 2020-21 (T-4) ...
Harmire Road, Barnard Castle, County Durham, DL12 8D (10 components)
• Distribution centre with behind the meter back up generation
• Load reduction on site supported by non-exporting standby generation.
• On-site existing CHP generating unit
Inactive • 2023-24 (T-4), 2021-22 (T-4) ...
British Gas, New Bridge Ln, Stockport, SK1 2HQ (20 components)

Office site with behind the meter bio-diesel generation - offsetting site load and exporting surplus

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
1 Waterfront Avenue, Edinburgh, EH5 1SG (25 components)
• Glenhove Water Pumping Station
• Office site with behind the meter generation
• On-site existing CHP generating unit
Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
Loading map...
Showing 9 locations