CENTRICA BUSINESS SOLUTIONS UK OPTIMISATION LIMITED

20 unique locations (196 components)

Active MW: 881.00 MW
Inactive MW: 4153.24 MW
1 Waterfront Avenue, Edinburgh, EH5 1SG (25 components)
• Glenhove Water Pumping Station
• Office site with behind the meter generation
• On-site existing CHP generating unit
Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
Bedford Road Workshops, Bedford Road, Aberdeen, AB24 3LE (6 components)
• On-site existing CHP generating unit
• This is a single CHP unit
Inactive • 2020-21 (T-4), 2017-18 (T-1)
British Gas, New Bridge Ln, Stockport, SK1 2HQ (20 components)

Office site with behind the meter bio-diesel generation - offsetting site load and exporting surplus

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Centrica Brigg Power Station, Scawby Brook, Brigg DN20 9LT. (17 components)

Centrica Brigg Power Station is an Open Cycle Gas Turbine (OCGT) electricity generating station.

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
EDF Energy, Torness power station, Torness, Dunbar, East Lothian, EH42 1QS (14 components)
• 1.9 MW Gas gen ENER-G 1999
• Torness Power Station CMU 1: [TN1-17] T_TORN-1 + (50% x T_TORN-D)
• Torness Power Station CMU 2: [TN2-17] T_TORN-2 + (50% x T_TORN-D)
Active • 2024-25 (T-4), 2021-22 (T-4) ...
Guildford Road, Cranleigh, GU6 8PA (3 components)
• Distribution Centre with behind the meter back-up generation.
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Inactive • 2021-22 (T-1), 2020-21 (T-4)
Harmire Road, Barnard Castle, County Durham, DL12 8D (10 components)
• Distribution centre with behind the meter back up generation
• Load reduction on site supported by non-exporting standby generation.
• On-site existing CHP generating unit
Inactive • 2023-24 (T-4), 2021-22 (T-4) ...
International Conference Centre, Birmingham, B1 2EA (13 components)
• 1.6MW Combined Heat and Power at International Conference Centre
• CHP Unit
• On-site existing CHP generating unit
Active • 2028-29 (T-4), 2025-26 (T-1) ...
Land adjacent to the SW of Glassenbury BESS, Glassenbury Road, Cranbrook, Kent, TN17 2QL (2 components)
• A new build storage station using batteries
• Steam Driven Turbo Alternator 8G4 7MWe (derated to 4 MWe for mechanical reasons)
Inactive • 2023-24 (T-4), 2020-21 (T-4)
Land at Claredown Farm Hickford Hill Belchamp St Paul Sudbury Essex CO10 7DW (7 components)
• 1 x hydro turbine & synchronous generator
• 20 MW of DSR
• One 8 MWe Gas Turbine Cogeneration Unit (GT2)
Inactive • 2023-24 (T-4), 2020-21 (T-4) ...
Land at Fawley , Northern Access Road, Southampton, SO45 1BD  (7 components)
• CMU Component is 500kVA reciprocating diesel engine.
• Gas Turbine CHP GT001B
• Taylor's Lane OCGT GT Unit 3 Unit fuelled by Gas Oil as specified in BS 2869 Class A2
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Land off, Dale Road, Spondon, Derby, East Midlands, England, DE21 7DL (2 components)
• 10 gas reciprocating engines used for power generation, with associated infrastructure.
• Palm Paper Limited operates a large paper making site in King's Lynn, Norfolk. The onsite industrial process is an energy intensive paper recycling and manufacturing plant. Palm Paper plans to shut down predetermined parts of this recycling process in response to system stress events and thereby deliver the stated load reduction capacity.
Inactive • 2021-22 (T-4), 2020-21 (T-4)
Land off Kibworth Road, Moss Farm, Kibworth Beauchamp, Leicester, LE8 0HJ (4 components)
• Component has yet to be procured
• Containerised Reciprocating Gas Engines
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2025-26 (T-4), 2024-25 (T-1) ...
Liberty Steel Newport, Coroporation Road, Newport, NP19 4XE (9 components)
• 6 diesel generators built on an existing industrial site although alternative fuel sources are also being considered.
• 6 diesel generators built on an existing industrial site, although alternative fuels are being tested before a final decision is made.
• Office site with behind the meter bio-diesel generation - offsetting site load and exporting surplus
Inactive • 2023-24 (T-4), 2020-21 (T-4) ...
Marks & Spencer - Stockley Park, 3 Longwalk Road, Stockley Park, Uxbridge, UB11 1AW (10 components)
• Glenlee hydro power station - Unit 2, part of the Galloway hydroelectric scheme The registered capacity of the Glenlee hydro power station is 30MVA or 24MW at 0.8PF and each of the 2 identical generating unit components at the station is 12MW.
• Load reduction
• Office site with behind the meter bio-diesel generation - offsetting site load and exporting surplus
Active • 2025-26 (T-4), 2023-24 (T-4) ...
North Avenue, Marston Green, Birmingham, B40 1NT. (12 components)
• Gas Generator - ENER-G 1521 - proposed to be installed on land to the north-east elevation of Hall 5 at the NEC Site.
• Import/Export metering with diesel generation at a retail store
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Unit 13 Newby Road Industrial Estate Hazel Grove Stockport SK7 5DA (1 component)

Office site with behind the meter bio-diesel generation - offsetting site load and exporting surplus

Inactive • 2020-21 (T-4)
Waterswallows, Tunstead Quarry, Tunstead, Buxton, Derbyshire SK17 8TG (23 components)
• On-site existing CHP generating unit
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Inactive • 2023-24 (T-1), 2022-23 (T-4) ...