Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

CENTRICA BUSINESS SOLUTIONS UK OPTIMISATION LIMITED

6 unique locations (97 components)

Active MW: 881.00 MW
Inactive MW: 4153.24 MW
RWE Cogen UK (Hythe) Ltd Charleston Road Hardley Hythe Southampton SO45 3BP (5 components)
• Lithium Ion battery storage system capable of charging, storing and discharging electricity. Land at Stevensons Farm, Arterial Road, Nevendon, Essex SS14 3JH.
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• On-site existing CHP generating unit
Active • 2026-27 (T-4), 2024-25 (T-4) ...
Land to the south east of Leyland National Substation, Braithwaite Road, Lillyhall Industrial Estate, Workington, CA14 4ED (4 components)
• 2.5 MW power plant comprising a series of gas reciprocating engines
• On-site existing CHP generating unit
Inactive • 2022-23 (T-4), 2017-18 (T-1)
Edgabaston, Birmingham, West Midlands, B15 2TT (40 components)
• Gas Engine
• Gas Turbine Generator
• Gas turbine generator
Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
Cookley Pumping Station, 8 Caunsall Road, Caunsell, Kidderminster, DY11 5YB (18 components)
• 1.280MW CHP
• Back up generation
• Onsite generation
Inactive • 2023-24 (T-1), 2019-20 (T-1) ...
Cleckheaton Road, Lowmoore, Bradford, BD12 0JZ (16 components)
• Gas Turbine Generator CHP (typhoon) SGT-100 rated 4,9 MWe
• Gas Turbine Generator CHP (typhoon) SGT-100 rated 4,9 MWe BABR-1_2
• Steam Turbine
Inactive • 2019-20 (T-1), 2018-19 (T-1) ...
Cleckheaton Road, Lowmoor, Bradford, BD12 0JZ (14 components)
• Diesel Reciprocating Generator, rated 1MWe nominal
• Diesel Reciprocating Generator, rated 1MWe nominal BABR-2
• Gas turbine generator 6.4MWe CHP BABR-1
Inactive • 2019-20 (T-1), 2018-19 (T-1) ...
Loading map...
Showing 6 locations