Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

CENTRICA BUSINESS SOLUTIONS UK OPTIMISATION LIMITED

19 unique locations (1282 components)

Active MW: 0.00 MW
Inactive MW: 0.00 MW
1 Waterfront Avenue, Edinburgh, EH5 1SG (12 components)

Office site with behind the meter generation (3)

DSR CENTRICA BUSINESS SOLUTIONS UK OPTIMISATION LIMITED Unproven DSR CMU CENEST CENEST +2 more EH5
Active • 2024-25 (T-4), 2023-24 (T-4) ...
2600 John Smith Drive, Oxford, OX4 2JY (19 components)

Office site with behind the meter bio-diesel generation - offsetting site load and exporting surplus (3)

DSR CENTRICA BUSINESS SOLUTIONS UK OPTIMISATION LIMITED Unproven DSR CMU CENEST CENEST1 +8 more OX4
Active • 2025-26 (T-4), 2024-25 (T-4) ...
BOC Brinsworth, Bawtry Road, Brinsworth, Rotherham, S60 5NT (9 components)

Industrial Gases production processes. DSR delivered through process interruption (3)

DSR BOC LIMITED Proven DSR CMU BOC001 TLGUK +3 more S60
Active • 2026-27 (T-1), 2025-26 (T-1) ...
BOC Fawley, Cadland Road, Hythe, SO45 3NX (9 components)

Industrial Gases production processes. DSR delivered through process interruption (3)

DSR BOC LIMITED Proven DSR CMU BOC001 TLGUK +3 more SO45
Active • 2026-27 (T-1), 2025-26 (T-1) ...
BOC Margam, Longlands Lane, Port Talbot, SA13 2NS (9 components)

Industrial Gases production processes. DSR delivered through process interruption (3)

DSR BOC LIMITED Proven DSR CMU BOC001 TLGUK +3 more SA13
Active • 2026-27 (T-1), 2025-26 (T-1) ...
BOC Middlesbrough, Teessdock Road, Grangetown, TS6 7RT (9 components)

Industrial Gases production site. DSR provided through process interruption. (3)

DSR BOC LIMITED Proven DSR CMU BOC001 TLGUK +3 more TS6
Active • 2026-27 (T-1), 2025-26 (T-1) ...
BOC Motherwell, Chapelknowle Road, Carfin, ML1 5LF (9 components)

Industrial Gases production processes. DSR delivered through process interruption (3)

DSR BOC LIMITED Proven DSR CMU BOC001 TLGUK +3 more ML1
Active • 2026-27 (T-1), 2025-26 (T-1) ...
BOC Scunthorpe, Warren Road, Scunthorpe, DN15 6XH (9 components)

Industrial Gases production processes. DSR delivered through process interruption (3)

DSR BOC LIMITED Proven DSR CMU BOC001 TLGUK +3 more DN15
Active • 2026-27 (T-1), 2025-26 (T-1) ...
British Gas, 4 Marine Drive, Edinburgh, EH5 1SG (2 components)

Office site with behind the meter bio-diesel generation - offsetting site load and exporting surplus (2)

Active • 2026-27 (T-4), 2025-26 (T-4)
British Gas, Bothwell Road, Uddingston, Glasgow, G71 7TW (19 components)

Office site with behind the meter bio-diesel generation - offsetting site load and exporting surplus (3)

DSR CENTRICA BUSINESS SOLUTIONS UK OPTIMISATION LIMITED Unproven DSR CMU CENEST CENEST1 +8 more G71
Active • 2025-26 (T-4), 2024-25 (T-4) ...
British Gas, New Bridge Ln, Stockport, SK1 2GT (8 components)

Office site with behind the meter bio-diesel generation - offsetting site load and exporting surplus (3)

DSR CENTRICA BUSINESS SOLUTIONS UK OPTIMISATION LIMITED Unproven DSR CMU CENEST2 CENEST2 +4 more SK1
Active • 2026-27 (T-4), 2025-26 (T-4) ...
n/a (618 components) Geocoding Needed

n/a

DSR SSE ENERGY SUPPLY LIMITED Unproven DSR CMU SSE DSR Unit 2 SSE DSR Unit 3 +3 more
Active • 2029-30 (T-4), 2028-29 (T-4) ...
N/A (457 components) Geocoding Needed
• DSR components shall be assigned prior to the start of the Delivery Year.
• We are currently in discussions with a number of DSR Customers, with the aggregate of the customers capacity totalling 50MW. Contracts are currently being written and reviewed between the parties involved.
• bus depot site
DSR EDF ENERGY CUSTOMERS LIMITED E.ON UK PLC ZENOBE RENTAL 12 LIMITED +8 more Unproven DSR CMU CMU_GE_DSR1 DSRUNP(MIX) +286 more
Active • 2029-30 (T-4), 2028-29 (T-4) ...
National Distribution Centre, Barnsdale Way, Grove Park, Leicester, Leicestershire, LE19 1SU. (5 components)

Distribution Centre with behind the meter back up generation (2)

Active • 2025-26 (T-4), 2024-25 (T-4) ...
North Avenue, Marston Green, Birmingham, B40 1NT (12 components)
• CHP Unit 850kWe proposed to be installed in Hall 6-8 at NEC site
• Gas Generation units at 1013kWe
• Proposed CHP Unit 850kWe to be installed in Hall 6-8 at NEC site
Active • 2024-25 (T-4), 2023-24 (T-4) ...
North Avenue, Marston Green, Birmingham, B40 1NT. (18 components)

Gas Generator - ENER-G 1521 - proposed to be installed on land to the north-east elevation of Hall 5 at the NEC Site. (3)

Active • 2024-25 (T-4), 2023-24 (T-4) ...
Poplar Avenue, King' Lynn, PE34 3AL (10 components)

Palm Paper Limited operates a large paper making site in King's Lynn, Norfolk. The onsite industrial process is an energy intensive paper recycling and manufacturing plant. Palm Paper plans to … (3)

DSR CENTRICA BUSINESS SOLUTIONS UK OPTIMISATION LIMITED Proven DSR CMU REST46 REST46 +2 more PE34
Active • 2026-27 (T-4), 2025-26 (T-4) ...
Saddlebow Industrial Estate, Poplar Avenue, Kings Lynn, PE34 3AL (17 components)

The DSR is created by load management of the on site, twin stream, paper De-Inking Plant. Metering arrangements will measure the net reduction resulting from an instruction to reduce the …

DSR Combined Heat and Power (CHP) Palm Paper Limited Unproven DSR CMU Palm Paper DIP PE34
Active • 2029-30 (T-4), 2028-29 (T-4) ...
Loading map...
Showing 19 locations