CENTRICA BUSINESS SOLUTIONS UK OPTIMISATION LIMITED

3 unique locations (129 components)

Active MW: 881.00 MW
Inactive MW: 4153.24 MW
Aberthaw Power Station The Leys Aberthaw Barry Mid Glamorgan CF62 4ZW (90 components)
• E1000 CHP
• Existing CCGT
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2026-27 (T-4), 2024-25 (T-4) ...
STV Line 3 EfW Haverton Hill Road Billingham Cleveland TS23 1PY (12 components)
• Combined Heat and Power Plant, St Marks Boiler House, capacity of generator 1.600MW. Although the supplier of the settled hh meter has provided their three peaks, we have used the combined peak of all the component units to determine the capacity of LDEC as a single CMU hence the connected capacity above being consistent with the three peaks of the combined units.
• Existing Energy from Waste Plant
• On-site existing CHP generating unit
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Weetabix, Station Rd, Burton Latimer, Kettering NN15 5JR, United Kingdom (27 components)
• Component has yet to be procured.
• EnerG 1000 CHP
• On-site CHP - existing generating unit
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Loading map...
Showing 3 locations