Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

CENTRICA BUSINESS SOLUTIONS UK OPTIMISATION LIMITED

40 unique locations (773 components) - Page 1 of 2

Active MW: 881.00 MW
Inactive MW: 4153.24 MW
195 Aylesone Rd, Leicester LE2 7QJ (29 components)

Office site with behind the meter bio-diesel generation - offsetting site load and exporting surplus

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
1 Waterfront Avenue, Edinburgh, EH5 1SG (25 components)
• Glenhove Water Pumping Station
• Office site with behind the meter generation
• On-site existing CHP generating unit
Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
2600 John Smith Drive, Oxford, OX4 2JY (35 components)
• Generating Unit 1
• Office site with behind the meter bio-diesel generation - offsetting site load and exporting surplus
• Operational gas reciprocating engine.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
2 Leeds City Office Park, Leeds, LS11 5BD (9 components)
• Office site with behind the meter back-up generation
• Office site with behind the meter back-up generation.
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
35 Arkwright Road, Astmoor, Runcorn, WA7 1NU. (2 components)
• On-site existing CHP generating unit
• The batteries are housed within racks and installed, together with converters, inside an existing building. The batteries will be installed in the racks off-site and then delivered to site ready for lay-down, connection to the sub-station, testing and commissioning.
Active • 2024-25 (T-4), 2022-23 (T-4)
97 Talbot Road, Stretford, Manchester, Lancashire, M16 0TW (5 components)
• Offsite with behind the meter generation
• On-site existing CHP generating unit
Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
Aberthaw Power Station The Leys Aberthaw Barry Mid Glamorgan CF62 4ZW (90 components)
• E1000 CHP
• Existing CCGT
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2026-27 (T-4), 2024-25 (T-4) ...
Arlesey Landfill Site Mill Lane Arlesey Bedfordshire SG15 6RF (11 components)
• 10 gas reciprocating engines used for power generation, with associated infrastructure.
• Energy facility comprising of reciprocating engine sets and ancillary equipment.
• Gas reciprocating engines
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Arrowe Park Road, Upton, Birkenhead, Wirral CH49 5PE (7 components)

On-site existing CHP generating unit

Inactive • 2022-23 (T-4), 2019-20 (T-1) ...
Bott Lane, Lye, Stourbridge, West Midlands DY9 7AW (10 components)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• Office site with behind the meter generation
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
British Gas, Bothwell Road, Uddingston, Glasgow, G71 7TW (42 components)
• BM unit T_DINO-1 at Dinorwig Power Station (Pumped Storage)
• Office site with behind the meter bio-diesel generation - offsetting site load and exporting surplus
• On-site existing CHP generating unit
Active • 2027-28 (T-4), 2024-25 (T-4) ...
British Gas, Housesteads, Off Stockport Road, Hattersley, SK14 3QU (5 components)
• Office site with behind the meter back-up generation.
• On-site existing CHP generating unit
Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
British Gas, New Bridge Ln, Stockport, SK1 2GT (15 components)
• A generating station consisting of multiple reciprocating engines and alternators located on a single site.
• Office site with behind the meter bio-diesel generation - offsetting site load and exporting surplus
Active • 2025-26 (T-4), 2024-25 (T-4) ...
3.08 MW
British Gas, New Bridge Ln, Stockport, SK1 2HQ (20 components)

Office site with behind the meter bio-diesel generation - offsetting site load and exporting surplus

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Centrica Brigg Power Station, Scawby Brook, Brigg DN20 9LT. (17 components)

Centrica Brigg Power Station is an Open Cycle Gas Turbine (OCGT) electricity generating station.

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Centrica Peterborough Power Station, Storeys Bar Road, Peterborough, PE1 5NT. (26 components)
• 1 x hydro turbine & synchronous generator
• 4MW battery co-located with a solar farm
• Centrica Peterborough Power Station (PPS) is an Open Cycle Gas Turbine (OCGT) electricity generating station.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Eastfield Road, North Killingholme, Immingham, North Lincolnshire, DN40 3LW (79 components)
• CMU consisting of multiple gas reciprocating engines and alternators
• Energy facility comprising of reciprocating engine sets.
• TBC
Active • 2026-27 (T-4), 2024-25 (T-4) ...
Energy Centre Westfield London, Ariel Way, White City, London, W12 7GF (32 components)
• A gas engine CHP site providing electricity & heat to the associated development
• On-site CHP - existing generating unit Pond Street London OS Grid Reference: TQ 272 854 NW3 2QG
• On-site CHP - existing generating unit The Ridgeway Enfield, Middlesex EN2 8JL OS Grid Reference: TQ 312 980
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Gunnels Wood Road, Stevenage, SG1 2NY, United Kingdom (25 components)
• CMU consisting of multiple reciprocating engines and alternators
• New build power station comprised of multiple reciprocating engines.
• On-site existing CHP generating unit
Active • 2024-25 (T-4), 2022-23 (T-4) ...
International Conference Centre, Birmingham, B1 2EA (13 components)
• 1.6MW Combined Heat and Power at International Conference Centre
• CHP Unit
• On-site existing CHP generating unit
Active • 2028-29 (T-4), 2025-26 (T-1) ...
Land at Broadditch Farm, New Barn Road, Southfleet, DA13 9PU (9 components)
• A new build 10MW battery storage system
• A new build 11MW battery storage system
• Office site with behind the meter bio-diesel generation - offsetting site load and exporting surplus
Active • 2025-26 (T-4), 2023-24 (T-1) ...
Land at Fawley , Northern Access Road, Southampton, SO45 1BD  (7 components)
• CMU Component is 500kVA reciprocating diesel engine.
• Gas Turbine CHP GT001B
• Taylor's Lane OCGT GT Unit 3 Unit fuelled by Gas Oil as specified in BS 2869 Class A2
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Land at Model Farm, Frenchs Road, Walpole St. Andrew, Norfolk, PE14 7JE. (17 components)
• 1 x Containerised High Speed Gas-fired reciprocating engines with an output of 2.5MW together with transformers, switchgear and associated control gear
• 2026 kW CHP unit
• N/A
Active • 2025-26 (T-4), 2022-23 (T-4) ...
Loading map...
Showing 25 locations