CENTRICA BUSINESS SOLUTIONS UK OPTIMISATION LIMITED

21 unique locations (170 components)

Active MW: 881.00 MW
Inactive MW: 4153.24 MW
Woodhouse Energy Centre A. Pearson and Sons? Nursery Alderley Edge SK9 7UW (13 components)
• The CMU Component will have a connection capacity of 3.298MW net of 46kW auxiliary load. Gas-fired reciprocating engine will be the technology used.
• The CMU Component will have a connection capacity of 3.376MW. Gas-fired reciprocating engine will be the technology used.
• The CMU component is installed in the Woodhouse Energy Centre that is located at a Nursery site in Alderley Edge.
• ... and 1 more unique description
Active • 2028-29 (T-4), 2027-28 (T-4) ...
RWE Cogen UK (Hythe) Ltd Charleston Road Hardley Hythe Southampton SO45 3BP (5 components)
• Hythe Power Station - Auxiliary load behind boundary meter
• Hythe Power Station - One (1) Gas Turbine, Two (2) Steam Turbines configured to operate in Combined Cycle Mode.
• Three (3) Reciprocating Gas Engines
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
National Distribution Centre, Barnsdale Way, Grove Park, Leicester, LE19 1SU (10 components)

Distribution Centre with behind the meter back-up generation.

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Marks & Spencer - Stockley Park, 3 Longwalk Road, Stockley Park, Uxbridge, UB11 1AW (10 components)
• DSR Component providing load turn down at a retail store
• Import/Export metering with diesel generation at a retail store
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Liberty Steel Newport, Coroporation Road, Newport, NP19 4XE (8 components)
• 6 diesel generators built on an existing industrial site although alternative fuel sources are also being considered.
• 6 diesel generators built on an existing industrial site, although alternative fuels are being tested before a final decision is made.
SIMEC POWER 1 Not Prequalified NP19
Inactive • 2020-21 (T-4), 2017-18 (T-1)
Land to the south east of Leyland National Substation, Braithwaite Road, Lillyhall Industrial Estate, Workington, CA14 4ED (4 components)

2.5 MW power plant comprising a series of gas reciprocating engines

Inactive • 2020-21 (T-4), 2017-18 (T-1)
Land at Fawley , Northern Access Road, Southampton, SO45 1BD  (4 components)

CMU Component is 500kVA reciprocating diesel engine.

Inactive • 2020-21 (T-4)
Land at Claredown Farm Hickford Hill Belchamp St Paul Sudbury Essex CO10 7DW (8 components)
• 20 MW of DSR
• 20 MW of demand reduction
• 20MW Battery Storage Facility located in Sudbury, Essex.
• ... and 1 more unique description
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Land adjacent to the SW of Glassenbury BESS, Glassenbury Road, Cranbrook, Kent, TN17 2QL (1 component)

A new build storage station using batteries

Inactive • 2020-21 (T-4)
Harmire Road, Barnard Castle, County Durham, DL12 8D (11 components)

On-site existing CHP generating unit

Active • 2024-25 (T-4), 2023-24 (T-4) ...
EDF Energy, Torness power station, Torness, Dunbar, East Lothian, EH42 1QS (12 components)
• Torness Power Station CMU 1: [TN1-16] T_TORN-1 + (50% x T_TORN-D)
• Torness Power Station CMU 1: [TN1-17] T_TORN-1 + (50% x T_TORN-D)
• Torness Power Station CMU 2: [TN2-16] T_TORN-2 + (50% x T_TORN-D)
• ... and 1 more unique description
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
CAULDON LOW QUARRY, CAULDON, STOKE ON TRENT, STAFFORDSHIRE, ST10 3EW (6 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Inactive • 2023-24 (T-4), 2021-22 (T-4) ...
Blackshaw Rd, London SW17 0QT (10 components)

CHP on a hospital site

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Bedford Road Workshops, Bedford Road, Aberdeen, AB24 3LE (6 components)

This is a single CHP unit

Inactive • 2020-21 (T-4), 2017-18 (T-1)
Asda Witham Highfields Road, Benfield Way Lakes Road Braintree CM7 3YS (10 components)
• Load reduction
• Load reduction.
Active • 2025-26 (T-4), 2022-23 (T-4) ...
Asda Gosforth Wansbeck Road, Wansbeck Road South Fawdon, Newcastle, NE3 3HQ (10 components)
• Load curtailment
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2025-26 (T-4) ...
1 Waterfront Avenue, Edinburgh, EH5 1SG (24 components)
• Glenhove Water Pumping Station
• Office site with behind the meter generation
• On-site existing CHP generating unit
Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
Loading map...
Showing 21 locations