CENTRICA BUSINESS SOLUTIONS UK OPTIMISATION LIMITED
18 unique locations (123 components)
2 Leeds City Office Park, Leeds, LS11 5BD (8 components)
Ainsworth Lane, Knowsley, Prescot, Mereyside, L34 9EU (10 components)
The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system. (2)
Arrowe Park Road, Upton, Birkenhead, Wirral CH49 5PE (7 components)
On-site existing CHP generating unit (3)
Blackshaw Rd, London SW17 0QT (10 components)
CHP on a hospital site
Bott Lane, Lye, Stourbridge, West Midlands DY9 7AW (10 components)
Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Cats Terminal, Seal Sands Rd, Middlesbrough, Cleveland, TS2 1UB (2 components)
Turbo Expander - for pressure reduction of incoming natural gas
Cats Terminal, Seal Sands Rd, Middlesbrough, Cleveland, TS2 1UB (6 components)
Turbo Expander - for pressure reduction of incoming natural gas
CAULDON LOW QUARRY, CAULDON, STOKE ON TRENT, STAFFORDSHIRE, ST10 3EW (6 components)
The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Clatterbridge Road, Bebington, Birkenhead, Wirral CH63 4JY (7 components)
On-site existing CHP generating unit
Former National Cars, Stopgate Lane, Simonswood, Liverpool L33 4YA (6 components)
The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system.
Gateshead Local Environmental Services, Park Road, Gateshead, NE8 3HN (7 components)
Battery storage
Knapton Generating Station, East Knapton, Malton, North Yorkshire, YO17 8JF (8 components)
Generating Station, the power generation facilities consist of RLM 6000 EGT generation package with a LM6000 gas turbine
Land at Claredown Farm Hickford Hill Belchamp St Paul Sudbury Essex CO10 7DW (8 components)
Maxi Readymix Concrete, Enderby Road,Industrial Estate, Whetstone, Leicester LE8 6HZ (4 components)
New build power station comprised of multiple reciprocating engines.
Melton Ross Quarries Barnetby, North Lincolnshire, DN38 6AE (2 components)
Melton Ross Quarries Barnetby, North Lincolnshire, DN38 6AE (4 components)
National Distribution Centre, Barnsdale Way, Grove Park, Leicester, LE19 1SU (10 components)
Distribution Centre with behind the meter back-up generation.
Old Gloucester Rd, Alveston, Bristol, UK, BS37 9TU (8 components)
This CMU is formed of a battery bank and PCS capable of providing 10MW of power. The system is connected via switch gear and a transformer to the 132kV network …