Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

CBS ENERGY STORAGE ASSETS UK LIMITED

11 unique locations (122 components)

Active MW: 91.08 MW
Inactive MW: 456.33 MW
25 Southfield Lingard Lane Stockport SK6 2QN (21 components)

1 x Containerised High Speed Gas-fired reciprocating engines with an output of 2.5MW together with transformers, switchgear and associated control gear

Inactive • 2022-23 (T-4), 2021-22 (T-4)
Aberaman Industrial Estate (South Bound), Aberaman, Nr Aberdare, Rhondda Cynon Taff, CF44 6DA (19 components)
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2028-29 (T-4), 2025-26 (T-4) ...
Centrica Brigg Power Station, Scawby Brook, Brigg DN20 9LT. (17 components)

Centrica Brigg Power Station is an Open Cycle Gas Turbine (OCGT) electricity generating station.

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Cowes Power Station Kingston Road East Cowes Isle of Wight PO32 6JS (31 components)
• Cowes 1 - OCGT, fuel is distillate MSID: 4548
• Cowes 2 - OCGT, fuel is distillate
• Cowes 2 - OCGT, fuel is distillate MSID: 4548
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Denmark Hill, Brixton, London, SE5 9RS (16 components)
• Behind the Meter CHP Unit
• CHP unit
• Gas fired CHP unit
Active • 2025-26 (T-1), 2023-24 (T-4) ...
Farburn?Place, Dyce, Aberdeen, AB21 7GP (2 components)

Battery Storage 2 hour duration

Active • 2024-25 (T-1)
Greenfield site, Stainton, Rotherham, S66 7RQ (1 component)

Battery Storage 2 hour duration

Active • 2026-27 (T-4)
Malton Road, Malton, West Knapton Yorkshire, YO17 8JF (2 components)

A 28MW new build of battery storage unit.

Active • 2028-29 (T-4), 2025-26 (T-1)
Rampside Road, Roosecote, Barrow in Furness, Cumbria, LA130PQ (8 components)

A Prospective New Build Battery Storage facility

Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
Scawby Brook, Brigg, Lincolnshire, DN20 9LT. (4 components)

Brigg Battery 2 hour duration

Active • 2028-29 (T-4), 2025-26 (T-4) ...
Loading map...
Showing 11 locations