Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

CAPELLA BESS LTD

3 unique locations (33 components)

Active MW: 0.00 MW
Inactive MW: 65.98 MW
Ryton Industrial Estate Blaydon NE21 4NT (2 components)

2 hour containerised battery storage

Active • 2028-29 (T-4)
BH10 (29 components)
• Domestic EV
• Domestic EV charger
Active • 2025-26 (T-1), 2025-26 (T-4) ...
ARMITAGE WAY NORTHWICH CW8 (2 components)
• 2 hour containerised battery storage
• CMU consists of reciprocating engines located in Swansea connected to the WPD system at 33kV. Auxiliary load is fed from before the metering and is therefore taken into account when delivering. The site generates at unity and therefore a power factor of 1.0 has been used to convert MVA to MW.
Active • 2028-29 (T-4), 2018-19 (T-4)
Loading map...
Showing 3 locations