Buxton Power Limited

56 unique locations (569 components) - Page 1 of 3

Active MW: 16.00 MW
Inactive MW: 31.05 MW
Waterswallows, Tunstead Quarry, Tunstead, Buxton, Derbyshire SK17 8TG (23 components)
• On-site existing CHP generating unit
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Inactive • 2023-24 (T-1), 2022-23 (T-4) ...
16.00 MW
Waterswallows Road, Fairfield, Buxton, SK17 7JB (4 components)

Diesel and/or gas reciprocating engines.

Inactive • 2017-18 (T-1)
Waterswallows Road Buxton Derbyshire SK17 7JB (21 components)
• 2.115MW Diesel and/or dual fuel reciprocating engine
• 2.115mw diesel and/or gas dual fuel reciprocating engine
• 2.116MW Diesel and / or gas dual fuel reciprocating engine
Inactive • 2018-19 (T-1)
Waterswallows Lane, Buxton, SK17 7HP (1 component)

Energy facility comprising of reciprocating engine sets.

Active • 2024-25 (T-4)
Waterswallows Lane, Buxton, Derbyshire SK17 7JD (4 components)

Energy facility comprising of reciprocating engine sets and ancillary equipment.

Active • 2024-25 (T-4), 2022-23 (T-4) ...
Tunstead Quarry, Waterswallows Road Tunstead House, Buxton, SK17 8TG (7 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2028-29 (T-4), 2025-26 (T-1) ...
0.31 MW
Tunstead Quarry (2), Waterswallows Road Tunstead House, Buxton, SK17 8TG (6 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2028-29 (T-4), 2025-26 (T-1) ...
16.00 MW
STOR Facility Waterswallows Road Green Fairfield Buxton Derbyshire SK17 7JP (1 component)

Battery energy storage facility with a 2 hour duration and a maximum capacity of 14 MW, located in Buxton.

Active • 2026-27 (T-4)
STOR Facility Waterswallows Road Green Fairfield Buxton Derbyshire SK17 7JB (4 components)
• Battery energy storage facility with a 2 hour duration and a maximum capacity of 14 MW, located in Buxton.
• Battery energy storage facility with a 2 hour duration and a maximum capacity of 14MW, located in Buxton
Active • 2025-26 (T-1), 2024-25 (T-1)
SPENCER ROAD BUXTON DERBYSHIRE SK17 (11 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
16.00 MW
POOL WATFORD ROAD BUXTON DERBYSHIRE SK17 (12 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
16.00 MW
Plot B Land at Waterswallows Road, Buxton, SK17 7JT (2 components)
• 5 x 2MW Gas fuelled generator units to be installed on designated land within a compound at Waterswallows Road
• Component has yet to be procured.
Active • 2024-25 (T-4), 2023-24 (T-4)
Plot A Land at Waterswallows Road, Buxton, SK17 7JT (4 components)
• 2 x 2MW Gas fuelled generator units to be installed on designated land within a compound at Waterswallows Road
• 3 x 2MW Gas fuelled generator units to be installed on designated land within a compound at Waterswallows Road
• 5 x 2MW Gas fuelled generator units to be installed on designated land within a compound at Waterswallows Road
Active • 2024-25 (T-4)
MEAD CLOSE BUXTON NORWICH NORFOLK NR10 (12 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
16.00 MW
MANCHESTER ROAD TIDESWELL BUXTON DERBYSHIRE SK17 (3 components)

EV charging at residential premises

Inactive • 2023-24 (T-1)
16.00 MW
Manchester Rd, Carrington, Manchester M31 4TG (33 components)
• 2 x 2.5 MW gas fuelled generators installed on land east of Griffiths Road.
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• The CMU component at Pikelaw Place is an energy storage system comprised of Lithium-ion batteries. The system will have a 10 MW export capacity and an import capacity of 10 MW.
Active • 2026-27 (T-4), 2024-25 (T-1) ...
MACCLESFIELD OLD ROAD BUXTON DERBYSHIRE SK17 (12 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
16.00 MW
LISMORE ROAD BUXTON DERBYSHIRE SK17 (10 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
16.00 MW
LEVEL LANE BUXTON DERBYSHIRE SK17 (9 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
16.00 MW
Land At STOR Facility Waterswallows Road Green Fairfield Buxton Derbyshire SK17 7JP (2 components)

Battery energy storage facility with a 2 hour duration and a maximum capacity of 16 MW, located in Buxton.

Active • 2026-27 (T-4)
Land at STOR Facility Waterswallows Road Green Fairfield Buxton Derbyshire SK17 7JB (2 components)

Battery energy storage facility with a 2 hour duration and a maximum capacity of 16MW, located in Buxton.

Active • 2025-26 (T-1)
Hindlow Stone, Sterndale Moor, Buxton, Derbyshire, SK17 9QD (6 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2028-29 (T-4), 2025-26 (T-1) ...
16.00 MW
Hindlow-Buxton Derbyshire - SK17 0EL - UK (3 components)

Mineals and lime producer

Inactive • 2017-18 (TR)
HERNSTONE LANE PEAK FOREST BUXTON DERBYSHIRE SK17 (3 components)

EV charging at residential premises

Inactive • 2023-24 (T-1)
16.00 MW
Hardybarn Lane, Buxton, SK17 7JP (2 components)

Diesel and/or gas reciprocating engines.

Inactive • 2017-18 (T-1)