Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Buxton Power Limited

53 unique locations (426 components) - Page 2 of 6

Active MW: 16.00 MW
Inactive MW: 31.05 MW
Plot B Land at Waterswallows Road, Buxton, SK17 7JT (2 components)
• 2 x 2MW Gas fuelled generator units to be installed on designated land within a compound at Waterswallows Road
• 5 x 2MW Gas fuelled generator units to be installed on designated land within a compound at Waterswallows Road
Active • 2024-25 (T-4)
Plot A Land at Waterswallows Road, Buxton, SK17 7JT (3 components)
• 2 x 2MW Gas fuelled generator units to be installed on designated land within a compound at Waterswallows Road
• 3 x 2MW Gas fuelled generator units to be installed on designated land within a compound at Waterswallows Road
• 5 x 2MW Gas fuelled generator units to be installed on designated land within a compound at Waterswallows Road
Active • 2024-25 (T-4)
MEAD CLOSE BUXTON NORWICH NORFOLK NR10 (12 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
16.00 MW
MANCHESTER ROAD TIDESWELL BUXTON DERBYSHIRE SK17 (3 components)

EV charging at residential premises

Inactive • 2023-24 (T-1)
16.00 MW
MACCLESFIELD OLD ROAD BUXTON DERBYSHIRE SK17 (12 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
16.00 MW
LISMORE ROAD BUXTON DERBYSHIRE SK17 (12 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
16.00 MW
LEVEL LANE BUXTON DERBYSHIRE SK17 (9 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
16.00 MW
Land off Batham Gate Road, North of Buxton, SK17 7HS (1 component)

This is a new battery storage plant, based on of lithium ion cells to be installed in multiple ISO compliant battery containers.

Inactive • 2021-22 (T-4)
Land At STOR Facility Waterswallows Road Green Fairfield Buxton Derbyshire SK17 7JP (1 component)

Battery energy storage facility with a 2 hour duration and a maximum capacity of 16 MW, located in Buxton.

Active • 2026-27 (T-4)
Land At STOR Facility Waterswallows Road Green Fairfield Buxton Derbyshire SK17 7JB (1 component)

Battery energy storage facility with a 2 hour duration and a maximum capacity of 16 MW, located in Buxton.

Active • 2024-25 (T-1)
Loading map...
Showing 10 locations