Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

BRK 001 Limited

4 unique locations (21 components)

Active MW: 47.72 MW
Inactive MW: 124.05 MW
Toray 3, Toray Textiles Import Way Crown Farm Way Nottinghamshire NG19 0FN (5 components)
• Gas fired generating unit
• Gas generating unit(s)
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
The Common, Malmesbury, Wiltshire, SN16 9RJ (11 components)
• 10 x 1mw Battery Storage units to be installed on designated land at Church Bottom - Connection offer is for 49.9mw which is split between CMUs - further detail in covering letter
• 19 x 1mw Battery Storage units to be installed on designated land at Church Bottom - Connection offer is for 49.9mw which is split between CMUs - further detail in covering letter
• 20 x 1mw Battery Storage units to be installed on designated land at Church Bottom - Connection offer is for 49.9mw which is split between CMUs - further detail in covering letter
• ... and 1 more unique description
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Energy Centre, Northwick Park Hospital, Watford Road, London, HA1 3UJ (1 component)

VIT42A - CHP unit at Energy Centre, Northwick Park Hospital, Watford Road, London, HA1 3UJ

Active • 2025-26 (T-4)
Asda Straiton, Bush Estate Penicuik EH26 0QA (4 components)

Mixture of load reduction and standby generation.

Inactive • 2020-21 (T-4), 2017-18 (T-1)
Loading map...
Showing 4 locations