Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

BALANCE POWER PROJECTS LIMITED

17 unique locations (44 components)

Active MW: 134.23 MW
Inactive MW: 13.08 MW
Aspatria Business Park, Park Road, Aspatria, Cumbria, CA7 3DP (2 components)
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines
• New build power station comprised of multiple reciprocating engines
Reciprocating engines OCGT and Reciprocating Engines SWB Power Ltd New Build Generating CMU Aspatria BP Not Prequalified CA7
Active • 2024-25 (T-4), 2021-22 (T-4)
Currock Trade Centre, Currock, Carlisle, Cumberland, England, CA2 5AD (2 components)

A Distribution Connected gas fueled generating station.

Reciprocating engines BALANCE POWER PROJECTS LIMITED New Build Generating CMU Currock 1 Currock 2 CA2
Active • 2028-29 (T-4)
Dig Gate Lane, Lady House, Milnrow, Rochdale, Greater Manchester, England, OL16 4NR (2 components)
• A Distribution Connected Battery Energy Storage System.
• A Distribution Connected gas fueled generating station.
Active • 2028-29 (T-4)
Land at Hydes Lane, Hinckley, LE10 3DP (2 components)
• A Distribution Connected Battery Energy Storage System
• The CMU comprises lithium ion batteries housed in ISO containers with additional containers used to house the converters
Active • 2028-29 (T-4), 2027-28 (T-4)
Land at Newburn Haug Industrial Estate, Riversdale Way, Newcastle Upon Tyne, NE15 8SG (1 component)

A gas fuelled electrical power generating unit comprising multiple reciprocating engines

Reciprocating engines BALANCE POWER PROJECTS LIMITED New Build Generating CMU Newburn Not Prequalified NE15
Active • 2025-26 (T-4)
Land Next To Bojea Farm, St Austell, PL25 5RU (2 components)
• A New Build Distribution Connected Battery Energy Storage System.
• The CMU comprises lithium ion batteries housed in ISO containers with additional containers used to house the converters
Storage (Duration 2h) Storage (Duration 1.5h) BALANCE POWER PROJECTS LIMITED New Build Generating CMU ST AUSTELLS ST AUSTELLS PL25
Active • 2027-28 (T-4), 2026-27 (T-4)
McQuittiston Farm, A70, Ochiltree, East Ayrshire, Scotland, KA6 6NF (2 components)
• A Distribution Connected Battery Energy Storage System
• The CMU comprises lithium ion batteries housed in ISO containers with additional containers used to house the converters
Active • 2028-29 (T-4), 2027-28 (T-4)
Northumberland Road, Newburn, NE15 8SF (3 components)
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines.
Reciprocating engines NEWBURN HAUGH POWER LIMITED New Build Generating CMU NEWBURN HAUGH Newburn Haugh Not Prequalified NE15
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Petre Road, Oakenshaw, Clayton-le-Moors, Hyndburn, Lancashire, England, BB5 5JB (2 components)

A Distribution Connected gas fueled generating station.

Reciprocating engines BALANCE POWER PROJECTS LIMITED New Build Generating CMU Clayton 1 Clayton 2 BB5
Active • 2028-29 (T-4)
Prowse's Lane, Axbridge, BS26 2HP (6 components)
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines.
• A new build gas fuelled power generating unit comprising multiple reciprocating engines.
• Total installed capacity is 6.9MW gas reciprocating engines to be installed on designated land within a compound.
Reciprocating engines SWB Power Ltd New Build Generating CMU AXBRIDGE AXBRIDGE Conditional BS26
Active • 2025-26 (T-4), 2024-25 (T-1) ...
Prowse's Lane, Axbridge, BS26 2HP. (6 components)

Total installed capacity is 6.9MW gas reciprocating engines to be installed on designated land within a compound. (3)

Reciprocating engines BIOGAS TECHNOLOGY LIMITED New Build Generating CMU Axbridge Axbridge +1 more BS26
Active • 2025-26 (T-4), 2024-25 (T-1) ...
Ribble Court, Red Scar Business Park, Preston, Lancashire, England, PR2 5LX (2 components)

A Distribution Connected gas fueled generating station.

Reciprocating engines BALANCE POWER PROJECTS LIMITED New Build Generating CMU Longridge 1 Longridge 2 PR2
Active • 2028-29 (T-4)
Royal Oak Way North, Daventry, NN11 8PQ (3 components)
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines.
Reciprocating engines Balance Energy 4 Ltd New Build Generating CMU Braunston Braunston Not Prequalified NN11
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Scottswood Road, Newcastle Upon Tyne, NE15 8SF (1 component)

The CMU comprises lithium ion batteries housed in ISO containers with additional containers used to house the converters

Storage (Duration 1.5h) BALANCE POWER PROJECTS LIMITED New Build Generating CMU Newburn Not Prequalified NE15
Active • 2027-28 (T-4)
Shaw Side, Heyside, Luzley Brook, Oldham, Greater Manchester, England, OL2 6HL (2 components)

A Distribution Connected gas fueled generating station.

Reciprocating engines BALANCE POWER PROJECTS LIMITED New Build Generating CMU Birshaw 1 Birshaw 2 OL2
Active • 2028-29 (T-4)
Wainwright Street, Hollins, Dukinfield, Tameside, Greater Manchester, England, SK16 5PL (2 components)

A Distribution Connected gas fueled generating station.

Reciprocating engines BALANCE POWER PROJECTS LIMITED New Build Generating CMU Sandy Lane 1 Sandy Lane 2 SK16
Active • 2028-29 (T-4)
Warren Park Way, Enderby, Leicester, LE19 4SA (4 components)
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines. (2)
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines
Reciprocating engines ENDERBY POWER LTD New Build Generating CMU ENDERBY2 Enderby +1 more Conditional LE19
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Loading map...
Showing 17 locations