BALANCE POWER PROJECTS LIMITED

18 unique locations (83 components)

Active MW: 281.35 MW
Inactive MW: 338.99 MW
Asda West Swindon, Iceland Foods Penzance Drive Swindon Wiltshire SN5 7JF (4 components)

Mixture of load reduction and standby generation.

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Aspatria Business Park, Park Road, Aspatria, Cumbria, CA7 3DP (2 components)
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines
• New build power station comprised of multiple reciprocating engines
Active • 2024-25 (T-4), 2021-22 (T-4)
Blauegate Works, Stanley Way, Lathom, Skelmersdale, WN8 8EA (9 components)
• Total installed capacity is 6.6MW of gas reciprocating engines to be installed on designated land within a manufacturing compound at Blauegate Works.
• Total installed capacity is 7,952kW OF gas reciprocating engines to be installed on designated land within a manufacturing compound at Blauegate Works.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Hawthorne Road, Bootle, Merseyside, L20 5AG. (3 components)

The CMU comprises Lithium Ion batteries housed in ISO containers with additional containers used to house the converters.

Active • 2024-25 (T-4), 2022-23 (T-4) ...
Land on Dalmarnock Road Trading Estate, Rutherglen, G73 1AN. See map uploaded. (5 components)

The facility consists of a lithium Ion battery storage system capable of importing, storing and exporting electricity. It connects to SPEN?s 33kV distribution network at 33kV.

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Low Dyke, Calthwaite, Penrith, CA11 9PS (4 components)

The CMU comprises lithium ion batteries housed in ISO containers with additional containers used to house the converters

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Rochester Power Generation Plant, Whitewall Road, Medway City Estate, Rochester, Kent, ME2 4DZ (10 components)
• Existing Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Active • 2026-27 (T-4), 2025-26 (T-1) ...
Runcorn site HQ, South Parade, PO Box 9, Runcorn, WA7 4JE (11 components)

Chemical manufacturer

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Southmead Industrial Park, Collett Road, Didcot, Oxon OX11 7PN (6 components)

2 POSGU (1.0MW and 0.6MW)

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Stainburn Road, Great Clifton, Derwent Valley, CA14 1TG (1 component)

New build power station comprised of multiple reciprocating engines

Inactive • 2021-22 (T-4)
The Research Centre, Parc Stormy, Stormydown, Bridgend, CF33 4RS (4 components)

4MW BESS

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Unit 30, New York Way, New York Industrial Park, NE27 0QF (1 component)

Battery Energy Storage System

Inactive • 2021-22 (T-4)
Unit 4, Cowper Road, Gilwilly Industrial Estate, Penrith, CA11 9BN (1 component)

New build power station comprised of multiple reciprocating engines

Inactive • 2021-22 (T-4)
Visitors Car Park, Alexandra Park, Alexandra Drive, St Helens, WA10 3TP (1 component)

New build power station comprised of multiple reciprocating engines

Inactive • 2021-22 (T-4)
West Road North, Cross Green, Leeds, West Yorkshire, LS10 1RR (2 components)
• Gas engines in a peaking plant environment
• New gas engines in a peaking plant environment, servicing power generation and DSR.
Inactive • 2022-23 (T-4), 2021-22 (T-4)
Loading map...
Showing 18 locations