Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

AXLE ENERGY LIMITED

22 unique locations (585 components)

Active MW: 0.00 MW
Inactive MW: 0.00 MW
CT19 (15 components)
• Domestic demand turn down (2)
• Domestic EV charger
Active • 2027-28 (T-4), 2025-26 (T-1) ...
DH5 (15 components)
• Domestic demand turn down (2)
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active • 2027-28 (T-4), 2025-26 (T-1) ...
DT3 (22 components)
• Domestic demand turn down (2)
• Domestic EV charge point
Active • 2027-28 (T-4), 2025-26 (T-1) ...
EH53 (13 components)
• Domestic demand turn down (2)
• Domestic EV
Active • 2027-28 (T-4), 2025-26 (T-1) ...
EX2 (45 components)
• Domestic demand turn down (2)
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active • 2027-28 (T-4), 2025-26 (T-1) ...
G63 (8 components)
• Domestic demand turn down (2)
• Domestic EV charger
Active • 2027-28 (T-4), 2025-26 (T-1) ...
G66 (19 components)
• Domestic demand turn down (2)
• Domestic EV
Active • 2027-28 (T-4), 2025-26 (T-1) ...
GL53 (27 components)
• Domestic demand turn down (2)
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active • 2027-28 (T-4), 2025-26 (T-1) ...
HG2 (34 components)
• Domestic demand turn down (2)
• Domestic EV charger
Active • 2027-28 (T-4), 2025-26 (T-1) ...
HP3 (33 components)
• Domestic demand turn down (2)
• Domestic EV
Active • 2027-28 (T-4), 2025-26 (T-1) ...
IG3 (19 components)
• Domestic demand turn down (2)
• Domestic EV charger
Active • 2027-28 (T-4), 2025-26 (T-1) ...
KT7 (8 components)
• Domestic demand turn down (2)
• Domestic EV charger
Active • 2027-28 (T-4), 2025-26 (T-1) ...
LU1 (14 components)
• Domestic demand turn down (2)
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active • 2027-28 (T-4), 2025-26 (T-1) ...
M33 (58 components)
• Domestic demand turn down (2)
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active • 2027-28 (T-4), 2025-26 (T-1) ...
NE11 (8 components)
• Domestic demand turn down (2)
• Domestic EV charger
Active • 2027-28 (T-4), 2025-26 (T-1) ...
NG13 (43 components)
• Domestic demand turn down (2)
• Domestic EV charger
Active • 2027-28 (T-4), 2025-26 (T-1) ...
PE28 (84 components)
• Domestic demand turn down (2)
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active • 2027-28 (T-4), 2025-26 (T-1) ...
PL14 (9 components)
• Domestic demand turn down (2)
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active • 2027-28 (T-4), 2025-26 (T-1) ...
S36 (35 components)
• Domestic demand turn down (2)
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active • 2027-28 (T-4), 2025-26 (T-1) ...
S66 (28 components)
• Domestic demand turn down (2)
• Domestic EV charge point
Active • 2027-28 (T-4), 2025-26 (T-1) ...
SK16 (12 components)
• Domestic demand turn down (2)
• Domestic EV charge point
Active • 2027-28 (T-4), 2025-26 (T-1) ...
SL1 (36 components)
• Domestic demand turn down (2)
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active • 2027-28 (T-4), 2025-26 (T-1) ...
Loading map...
Showing 22 locations