Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

AXLE ENERGY LIMITED

2408 unique locations (57912 components) - Page 82 of 97

Active MW: 260.05 MW
Inactive MW: 13.73 MW
CM23 (107 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Inactive •
24.02 MW
CM22 (22 components)
• Domestic EV charger
• Domestic demand turn down
Inactive •
11.95 MW
CM21 (23 components)

Domestic EV charger

Inactive •
9.04 MW
CM20 (9 components)

Domestic EV charger

Inactive •
9.05 MW
CM2 (87 components)
• Domestic EV
• Domestic EV charge point
• Domestic EV charger
Inactive •
19.54 MW
CM19 (15 components)

Domestic EV charger

Inactive •
12.15 MW
CM18 (17 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Inactive •
11.96 MW
CM17 (26 components)
• Domestic EV
• Domestic EV charger
• Domestic demand turn down
Inactive •
20.29 MW
CM16 (35 components)
• Domestic EV charger
• Domestic demand turn down
Inactive •
12.15 MW
CM15 (23 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Inactive •
4.57 MW
CM14 (26 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Inactive •
4.56 MW
CM13 (67 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Inactive •
24.02 MW
CM12 (42 components)

Domestic EV charger

Inactive •
12.78 MW
CM11 (41 components)
• Domestic EV
• Domestic EV charger
• Domestic demand turn down
Inactive •
9.04 MW
CM1 (70 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Inactive •
19.55 MW
CM0 (31 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2024-25 (T-1), 2024-25 (T-4) ...
7.38 MW
CH8 (22 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Inactive •
3.55 MW
CH7 (34 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Inactive •
3.57 MW
CH66 (41 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Inactive •
11.87 MW
CH65 (22 components)

Domestic EV charger

Inactive •
3.52 MW
CH64 (32 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Inactive •
14.98 MW
CH63 (37 components)
• Domestic EV
• Domestic EV charge point
• Domestic EV charger
Inactive •
12.07 MW
CH62 (18 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Inactive •
11.86 MW
CH61 (8 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Inactive •
4.48 MW
CH60 (16 components)

Domestic EV charger

Inactive •
4.48 MW
Loading map...
Showing 25 locations