Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

AXLE ENERGY LIMITED

2216 unique locations (46344 components) - Page 6 of 89

Active MW: 244.36 MW
Inactive MW: 29.42 MW
W6 (2 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4)
W5 (8 components)
• Domestic EV
• Domestic EV charge point
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
0.05 MW
W4 (6 components)

Domestic EV charger

Active • 2025-26 (T-4), 2024-25 (T-4) ...
4.48 MW
W3 (10 components)

Domestic EV charger

Active • 2024-25 (T-4), 2024-25 (T-1)
W14 (3 components)

Domestic EV charger

Active • 2025-26 (T-4), 2024-25 (T-4) ...
7.59 MW
W13 (5 components)

Domestic EV charger

Active • 2025-26 (T-4), 2025-26 (T-1) ...
W12 (3 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-4), 2024-25 (T-1)
4.48 MW
UB9 (15 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
7.39 MW
UB8 (13 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-1), 2024-25 (T-4) ...
34.78 MW
UB7 (6 components)
• Domestic EV
• Domestic EV charger
Active • 2025-26 (T-4), 2025-26 (T-1) ...
UB6 (13 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-4), 2025-26 (T-1) ...
0.03 MW
UB5 (10 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-4), 2024-25 (T-4) ...
4.48 MW
UB4 (9 components)
• Domestic EV
• Domestic EV charge point
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active • 2025-26 (T-1), 2024-25 (T-4) ...
UB3 (7 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-1), 2024-25 (T-4) ...
0.03 MW
UB2 (8 components)
• Domestic EV charge point
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
7.59 MW
UB10 (39 components)
• Domestic EV
• Domestic EV charge point
• Domestic EV charger
Active • 2025-26 (T-4), 2025-26 (T-1) ...
4.48 MW
UB1 (5 components)

Domestic EV charger

Active • 2025-26 (T-4), 2024-25 (T-4) ...
12.07 MW
TW9 (5 components)

Domestic EV charger

Active • 2024-25 (T-4), 2024-25 (T-1)
TW7 (17 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-4), 2025-26 (T-1) ...
19.46 MW
TW5 (14 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-4), 2025-26 (T-1) ...
12.07 MW
TW4 (6 components)
• Domestic EV
• Domestic EV charge point
• Domestic EV charger
Active • 2025-26 (T-4), 2025-26 (T-1) ...
4.48 MW
TW3 (7 components)
• Domestic EV charge point
• Domestic EV charger
Active • 2025-26 (T-4), 2025-26 (T-1) ...
7.59 MW
TW20 (17 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
11.87 MW
TW2 (16 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active • 2025-26 (T-4), 2025-26 (T-1) ...
4.48 MW
TW19 (8 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-1), 2024-25 (T-4) ...
7.39 MW
Loading map...
Showing 25 locations