Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

AXLE ENERGY LIMITED

2216 unique locations (46344 components) - Page 35 of 89

Active MW: 244.36 MW
Inactive MW: 29.42 MW
HU11 (14 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-1), 2024-25 (T-4) ...
0.03 MW
HU12 (23 components)

Domestic EV charger

Active • 2025-26 (T-4), 2025-26 (T-1) ...
4.48 MW
HU13 (25 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-4), 2025-26 (T-1) ...
7.39 MW
HU14 (26 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
7.59 MW
HU15 (25 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-4), 2025-26 (T-1) ...
4.48 MW
HU16 (13 components)

Domestic EV charger

Active • 2024-25 (T-4), 2024-25 (T-1)
0.03 MW
HU17 (38 components)
• Domestic EV
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active • 2025-26 (T-4), 2025-26 (T-1) ...
19.46 MW
HU18 (2 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active • 2025-26 (T-4), 2025-26 (T-1)
4.48 MW
HU3 (11 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active • 2025-26 (T-4), 2025-26 (T-1) ...
14.98 MW
HU4 (4 components)

Domestic EV charger

Active • 2025-26 (T-1), 2024-25 (T-4) ...
HU5 (7 components)

Domestic EV charger

Active • 2024-25 (T-4), 2024-25 (T-1)
HU6 (3 components)

Domestic EV charger

Active • 2025-26 (T-4), 2025-26 (T-1)
7.39 MW
HU7 (28 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-4), 2025-26 (T-1) ...
12.07 MW
HU8 (10 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2025-26 (T-1), 2024-25 (T-4) ...
34.78 MW
HU9 (9 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-4), 2025-26 (T-1) ...
HX1 (3 components)

Domestic EV charger

Active • 2025-26 (T-4), 2024-25 (T-4) ...
HX2 (14 components)
• Domestic EV
• Domestic EV charge point
• Domestic EV charger
Active • 2025-26 (T-4), 2025-26 (T-1) ...
7.39 MW
HX3 (42 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
7.39 MW
HX4 (7 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2024-25 (T-4), 2024-25 (T-1)
HX5 (8 components)

Domestic EV charger

Active • 2025-26 (T-1), 2024-25 (T-4) ...
7.39 MW
HX6 (17 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
7.39 MW
HX7 (15 components)

Domestic EV charger

Active • 2025-26 (T-4), 2025-26 (T-1) ...
7.59 MW
IG1 (17 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2025-26 (T-4), 2025-26 (T-1) ...
7.59 MW
IG10 (28 components)
• Domestic EV
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
14.98 MW
IG11 (8 components)
• Domestic EV
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active • 2025-26 (T-1), 2024-25 (T-4) ...
Loading map...
Showing 25 locations