AXLE ENERGY LIMITED

2405 unique locations (47337 components) - Page 34 of 97

Active MW: 260.05 MW
Inactive MW: 13.73 MW
GU20 (12 components)

Domestic EV charger

Active • 2024-25 (T-4), 2024-25 (T-1)
3.52 MW
GU21 (27 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
7.39 MW
GU22 (37 components)
• Domestic EV
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-4), 2025-26 (T-1) ...
11.87 MW
GU23 (14 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
7.39 MW
GU24 (14 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2025-26 (T-4), 2025-26 (T-1) ...
3.52 MW
GU25 (14 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
4.48 MW
GU26 (23 components)
• Domestic EV
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-4), 2025-26 (T-1) ...
11.86 MW
GU27 (15 components)
• Domestic EV
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-4), 2025-26 (T-1) ...
4.48 MW
GU28 (16 components)
• Domestic EV
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-1), 2024-25 (T-4) ...
7.39 MW
GU29 (7 components)

Domestic EV charger

Active • 2025-26 (T-4), 2024-25 (T-4) ...
7.59 MW
GU3 (12 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
3.52 MW
GU30 (8 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active • 2025-26 (T-1), 2024-25 (T-4) ...
3.55 MW
GU31 (27 components)
• Domestic EV charge point
• Domestic EV charger
Active • 2025-26 (T-4), 2025-26 (T-1) ...
7.38 MW
GU32 (13 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active • 2025-26 (T-4), 2025-26 (T-1) ...
11.86 MW
GU33 (18 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active • 2025-26 (T-4), 2025-26 (T-1) ...
7.38 MW
GU34 (56 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
14.98 MW
GU35 (32 components)
• Domestic EV
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
11.87 MW
GU4 (25 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
12.07 MW
GU46 (27 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
4.48 MW
GU47 (13 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-4), 2025-26 (T-1) ...
7.38 MW
GU5 (17 components)

Domestic EV charger

Active • 2025-26 (T-4), 2025-26 (T-1) ...
19.46 MW
GU51 (40 components)
• Domestic EV
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
7.38 MW
GU52 (28 components)
• Domestic EV
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
7.59 MW
GU6 (28 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
14.98 MW
GU7 (30 components)
• Domestic EV charge point
• Domestic EV charger
Active • 2025-26 (T-4), 2025-26 (T-1) ...
3.52 MW
Loading map...
Showing 25 locations