ATTUNE POWER LTD

60 unique locations (3086 components) - Page 2 of 3

Active MW: 4.79 MW
Inactive MW: 56.91 MW
KT15 (25 components)
• Domestic EV
• Domestic EV charger
• Domestic demand turn down
Active • 2024-25 (T-1), 2024-25 (T-4) ...
4.79 MW
KT6 (23 components)
• Domestic EV
• Domestic EV charger
• Domestic demand turn down
Active • 2024-25 (T-1), 2024-25 (T-4) ...
4.79 MW
KY11 (97 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2024-25 (T-1), 2024-25 (T-4) ...
4.79 MW
KY15 (26 components)
• Domestic EV
• Domestic EV charger
Active • 2024-25 (T-1), 2024-25 (T-4) ...
4.79 MW
L35 (21 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2024-25 (T-1), 2024-25 (T-4) ...
LE10 (83 components)
• Domestic EV
• Domestic EV charge point
• Domestic EV charger
Active • 2024-25 (T-1), 2024-25 (T-4) ...
4.79 MW
LE65 (26 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2024-25 (T-1), 2024-25 (T-4) ...
LU7 (87 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2024-25 (T-1), 2024-25 (T-4) ...
4.79 MW
MK42 (34 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active • 2024-25 (T-1), 2024-25 (T-4) ...
4.79 MW
MK45 (68 components)
• Domestic EV
• Domestic EV charger
• Domestic demand turn down
Active • 2024-25 (T-1), 2024-25 (T-4) ...
4.79 MW
NE3 (54 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2024-25 (T-1), 2024-25 (T-4) ...
NP7 (57 components)
• Domestic EV
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active • 2024-25 (T-1), 2024-25 (T-4) ...
4.79 MW
NR18 (65 components)
• Domestic EV
• Domestic EV charge point
• Domestic EV charger
Active • 2024-25 (T-1), 2024-25 (T-4) ...
4.79 MW
PE28 (140 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2024-25 (T-1), 2024-25 (T-4) ...
4.79 MW
PO8 (60 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2024-25 (T-1), 2024-25 (T-4) ...
4.79 MW
PR8 (49 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active • 2024-25 (T-1), 2024-25 (T-4) ...
4.79 MW
RG17 (24 components)
• Domestic EV
• Domestic EV charger
• Domestic demand turn down
Active • 2024-25 (T-1), 2024-25 (T-4) ...
4.79 MW
RG22 (55 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2024-25 (T-1), 2024-25 (T-4) ...
RG41 (82 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2024-25 (T-1), 2024-25 (T-4) ...
4.79 MW
RM18 (15 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2024-25 (T-1), 2024-25 (T-4) ...
4.79 MW
SK8 (65 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2024-25 (T-1), 2024-25 (T-4) ...
4.79 MW
SL6 (104 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2024-25 (T-1), 2024-25 (T-4) ...
4.79 MW
SL9 (42 components)
• Domestic EV
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active • 2024-25 (T-1), 2024-25 (T-4) ...
4.79 MW
SN14 (53 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2024-25 (T-1), 2024-25 (T-4) ...
SN25 (55 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active • 2024-25 (T-1), 2024-25 (T-4) ...
4.79 MW
Loading map...
Showing 25 locations