Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

ALKANE ENERGY UK LIMITED

211 unique locations (1691 components) - Page 1 of 9

Active MW: 171.93 MW
Inactive MW: 772.22 MW
Aberthaw Power Station The Leys Aberthaw Barry Mid Glamorgan CF62 4ZW (90 components)
• E1000 CHP
• Existing CCGT
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2026-27 (T-4), 2024-25 (T-4) ...
Ardagh Group - Doncaster Site 1, Barnby Dun Road, Wheatley, Doncaster, South Yorkshire, DN2 4RH (18 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
Ardagh Group - Doncaster Site 2, Barnby Dun Road, Wheatley, Doncaster, South Yorkshire, DN2 4RH (18 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
Arlesey Landfill Site Mill Lane Arlesey Bedfordshire SG15 6RF (4 components)
• Gas reciprocating engines
• The system comprises of two gas reciprocating engines provided an exported output of around 2MW.
Active • 2027-28 (T-4), 2023-24 (T-1) ...
Arlesey Landfill Site Mill Lane Arlesey Bedfordshire SG15 6RF (11 components)
• Energy facility comprising of reciprocating engine sets and ancillary equipment.
• Gas reciprocating engines
• Palm Paper Limited operates a large paper making site in King's Lynn, Norfolk. The onsite industrial process is an energy intensive paper recycling and manufacturing plant. Palm Paper plans to shut down predetermined parts of this recycling process in response to system stress events and thereby deliver the stated load reduction capacity.
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Asda Brierley Hill, Pedmore Road Brierley Hill West Midlands DY5 1LJ (9 components)
• Gas CHP engines in commercial horticultural usage with no auxilliary load
• Load reduction
• N/A
Active • 2025-26 (T-4), 2022-23 (T-3) ...
Asda Chorley Ringway, Water Street , Chorley, PR7 1EX (10 components)
• Load curtailment
• Load curtailment from refridgeration
• Municipal waste incineration plant located in Tyseley Birmingham. It is based on boilers supplying steam to a turbine-generator.
Active • 2028-29 (T-4), 2025-26 (T-4) ...
Asda Leek, Meerbrook, Leek, Staffordshire, ST13 8TQ (5 components)
• Gas turbine generator
• Kendoon hydro power station - Unit 1, part of the Galloway hydroelectric scheme
• Load reduction on site supported by non-exporting standby generation.
Active • 2027-28 (T-4), 2024-25 (T-1) ...
Askern CMM Generation Campsall Road Askern Doncaster DN6 0FD (1 component)

38 x 400kW cleaned thermal ( using Exhaust Gas Treatments) diesel gensets Disputes: 38*400kW, 50Hz canopy type diesel generator sets ( MTU/Caterpillar that meet the EU?s Stage III A emissions …

Inactive • 2020-21 (T-4)
Aveley Landfill Site Sandy Lane Aveley RM15 4XP (8 components)
• 4x gas reciprocating engines with a combined output of approximately 4.3MW. All associated gas delivery equipment and switchgear is included. The generating units are connected to the distribution network.
• Gas fired generating units
• Gas reciprocating engines
Active • 2027-28 (T-4), 2023-24 (T-1) ...
Aveley Landfill Site Sandy Lane Aveley RM15 4XP (14 components)
• EV charging at residential premises
• Gas fired generating units
• Gas reciprocating engines
Active • 2027-28 (T-4), 2025-26 (T-4) ...
Aveley Landfill Site, Sandy Lane, Aveley, RM15 4XP (6 components)
• Gas reciprocating engines
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Balance Power Ltd, Customs House, Ipswich Docks, Ipswich, Suffolk, IP3 0DP (6 components)
• CMU Component is 500kVA reciprocating diesel engine.
• Gas reciprocating engines
Inactive • 2022-23 (T-3), 2020-21 (T-4) ...
Bevercotes 1 Energy Park, West Drayton Avenue, Bevercotes, Nottinghamshire, DN22 8DB (14 components)
• Cruachan pump storage hydro plant - Unit 4
• Gas fired reciprocating engines
• Gas reciprocating engines
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Bevercotes Energy Park West Drayton Avenue Bevercotes Nottinghamshire DN22 8DB (2 components)
• 1 x Containerised High Speed Gas-fired reciprocating engines with an output of 2.5MW together with transformers, switchgear and associated control gear
• The CMU component will consist of a single diesel engined generator installed close to the existing farm buildings at Milburn House farm. The generator will be located alongside a renewable energy scheme already with planning consent on the site.
Inactive • 2021-22 (T-4), 2020-21 (T-4)
Bilsthorpe 1 Energy Park Former Colliery Bilsthorpe Newark Notts NG22 8ST (3 components)
• 1x 1.55MW Containerised Generating sets.
• EV charging at residential premises
Inactive • 2023-24 (T-1), 2016-17 (TR)
Bilsthorpe Colliery Site Bilsthorpe Newark Notts NG22 8ST (2 components)
• Gas fired reciprocating engines
• Gas reciprocating engines
Inactive • 2023-24 (T-4), 2019-20 (T-1)
Loading map...
Showing 25 locations