Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

ALKANE ENERGY CM LIMITED

10 unique locations (58 components)

Active MW: 144.09 MW
Inactive MW: 800.06 MW
Alkane Energy Park Plot 3 Halesfield 23 Telford TF7 4NZ (6 components)

2x 2MW Containerised Generating Sets. Whitwell 2 - Auxiliary load subtracted prior to the metering point.

Active • 2017-18 (T-1)
Alkane Haydock Energy Park Unit 2 Old Boston Trading Estate Wilcock Road Haydock WA11 9SJ (12 components)
• 4x 2MW Containerised Generating Sets
• Gas fired generating engines
Active • 2018-19 (T-1), 2017-18 (T-1)
Bevercotes Energy park, West Drayton Avenue, Bevercotes, Nottinghamshire, DN22 8DP (2 components)

3 x 3 battery storage (supplied by Anesco)

Active • 2020-21 (T-4)
Land off Baulker Lane - Clipstone - Mansfield - Notts - NG21 8BG (6 components)

5x 2MW Containerised Generating Sets. Clipstone 1 - Land off Baulker Lane - Clipstone - Mansfield - Notts - NG21 8BG. Auxiliary load subtracted prior to the metering point.

Active • 2017-18 (T-1)
Land off Kid Glove Road - Golborne - Wigan - WA3 3DP (7 components)

2x 1.56MW Containerised Generating Sets. Goldbourne 1 - Land off Kid Glove Road - Golborne - Wigan - WA3 3DP. Auxiliary load subtracted prior to the metering point.

Active • 2017-18 (T-1)
NG21 8BG (14 components)
• 5x 2MW Containerised Generating Sets. Star Lane: Unit 1, Star Lane, Harwich, Bolton, BL6 5HR Leopold Street: 18 Leopold Street, Pemberton, Wigan, WN5 8DH. Auxiliary load subtracted prior to the metering point.
• Star Lane: Unit 1, Star Lane, Harwich, Bolton, BL6 5HR
Active • 2017-18 (T-1)
Offham Landfill Site, Teston Road, Offham, West Malling, Kent, ME19 5PF (3 components)

Solar PV generation site

Active • 2027-28 (T-4), 2025-26 (T-1) ...
Solihull Sears Rp - South Birmingham B90 4QY (1 component)

Commercial sites

Active • 2024-25 (T-1)
0.46 MW
Unit 1, Block L, Aven Industrial Estate, Maltby, Rotherham, S66 7QR (2 components)
• 4 x 2MW gas gen sets
• 8 x 2MW gas gen sets
Active • 2020-21 (T-4)
Loading map...
Showing 10 locations