Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

ADD Renewables Limited

5 unique locations (14 components)

Active MW: 12.75 MW
Inactive MW: 53.00 MW
Land East of Bowbridge Lane, New Balderton, Newark, Nottinghamshire, NG24 3BY (4 components)

New Build CMU comprising of battery storage and associated plant

Active • 2028-29 (T-4), 2027-28 (T-4)
Land directly South to Coventry Substation, Parrotts Grove, AldermanCoventry, CV2 1NQ (3 components)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Inactive • 2023-24 (T-1)
Land at Hydes Lane, Hinckley, LE10 3DP (2 components)
• A Distribution Connected Battery Energy Storage System
• The CMU comprises lithium ion batteries housed in ISO containers with additional containers used to house the converters
Active • 2028-29 (T-4), 2027-28 (T-4)
Land adjacent to Norrington Common BSP, Norrington Lane, Broughton Gifford, Melksham, Wiltshire, SN12 8LT (4 components)

New Build CMU comprising of battery storage and associated plant

Active • 2028-29 (T-4), 2027-28 (T-4)
Loading map...
Showing 5 locations