ADD Renewables Limited

5 unique locations (61 components)

Active MW: 12.75 MW
Inactive MW: 53.00 MW
10-14 Birmingham Road, West Bromwich, B71 4LD (5 components)
• Energy Centre comprising of Lean Burn, Acoustically Treated Natural Gas Reciprocating Engines.
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Inactive • 2022-23 (T-4), 2021-22 (T-1)
Bond Avenue Bletchley Milton Keynes MK1 1JJ (19 components)
• Component has yet to be procured.
• The CMU component comprises of three 2MW Reciprocating Gas Engines
Active • 2028-29 (T-4), 2022-23 (T-4) ...
Cantelo Reception, UK Power Reserve Ltd, Bradon Farm, Isle Abbots, Taunton, Somerset. TA3 6RX (17 components)
• New build battery storage.
• The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
Active • 2027-28 (T-4), 2026-27 (T-4) ...
West Marsh Road Spalding Lincolnshire PE11 3BB (16 components)
• Battery storage located at Drayton Manor Farm, Alcester Road, Stratford-Upon-Avon, CV37 9RG with a nameplate capacity of 1.000 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
• Kiln Power is a 16 MW power plant comprising gas reciprocating engines. The export of the power plant is connected to the local distribution network via two separately metered 8MW connections (of which this is one of the two CMU components) and it is connected to the local gas network. Kiln Power has a single Balancing Service ID - NGSTORKILN218. To distinguish between the two components of the CMU a numbering system has been used. The two components are separately metered.
• Wind Turbines to be installed at Crossdykes Wind Farm
Active • 2027-28 (T-4), 2024-25 (T-4) ...
West Wickham (Croydon) WTW, Addington Road, , West Wickham, United Kingdom, BR4 9BF (4 components)
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Active • 2025-26 (T-4), 2024-25 (T-1) ...