ADD Renewables Limited

14 unique locations (313 components)

Active MW: 0.00 MW
Inactive MW: 65.75 MW
BRIAR ROAD KIRKINTILLOCH GLASGOW LANARKSHIRE G66 (3 components)
• 1 x Merlees 6MW reciprocating engine and all associated auxiliary equipment Brogoborugh Landfill Site Woburn Road Brogborough Bedfordshire MK43 0TN SP970401
• Barnsley CMU Outlined in associated Construction Plan Bootle and Barnsley Output metered net of Station Load - no separate metered auxiliary exists
• Domestic EV charger
Active • 2025-26 (T-4), 2019-20 (T-4) ...
EH41 (28 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
18.72 MW
EX23 (33 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2025-26 (T-1), 2025-26 (T-4) ...
2.81 MW
FALCON DRIVE NEWTON MEARNS GLASGOW G77 (2 components)
• Bootle CMU Outlined in asscociated Construction Plan Bootle and Barnsley Output metered net of Station Load - no separate metered auxiliary exists
• Existing CCGT to be refurbished
Active • 2028-29 (T-4), 2018-19 (T-4)
4.21 MW
GL52 (135 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
2.81 MW
HEATHERBELL ROAD COATBRIDGE ML5 (2 components)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• Spalding CMU Outlined in associated Construction Plan Output metered net of Station Load - no separate metered auxiliary exists
Active • 2025-26 (T-4), 2018-19 (T-4)
2.81 MW
HENRY MOORE COURT WOOLLEY GRANGE BARNSLEY SOUTH YORKSHIRE S75 (2 components)
• A site with two gas engine CHPs, providing hot water to a local district heating network
• Balderton CMU OSREF SK7993551021 Outlined in associated Construction Plan Output metered net of Station Load - no separate metered auxiliary exists
Active • 2028-29 (T-4), 2018-19 (T-4)
2.81 MW
KILN WAY PADDOCK WOOD TONBRIDGE KENT TN12 (3 components)
• Domestic EV charger
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• Thurgaton CMU Outlined in associated Construction Plan Output metered net of Station Load - no separate metered auxiliary exists
Active • 2025-26 (T-4), 2025-26 (T-1) ...
5.62 MW
LAND OFF HELEN STREET, GLASGOW, G52 1EE (1 component)

10 gas reciprocating engines used for power generation, with associated infrastructure.

Inactive • 2021-22 (T-4)
LD3 (38 components)
• Domestic EV charge point
• Domestic EV charger
Active • 2025-26 (T-1), 2025-26 (T-4) ...
NIMROD GROVE WOODFORD STOCKPORT CHESHIRE SK7 (3 components)
• Hinckley CMU Outlined in associated Construction Plan Output metered net of Station Load - no separate metered auxiliary exists
• Torness Power Station CMU 1: [TN1-24] T_TORN-1 + (50% x T_TORN-D)
Active • 2028-29 (T-4), 2025-26 (T-4) ...
18.72 MW
ROBIN CLOSE OLLERTON NEWARK NOTTINGHAMSHIRE NG22 (2 components)
• Barnsley CMU Outlined in associated Construction Plan Bootle and Barnsley Output metered net of Station Load - no separate metered auxiliary exists
• Existing CCGT
Active • 2028-29 (T-4), 2018-19 (T-4)
WOOD END BLUNTISHAM HUNTINGDON PE28 (2 components)
• Domestic EV charger
• Hinckley CMU Outlined in associated Construction Plan Output metered net of Station Load - no separate metered auxiliary exists
Active • 2025-26 (T-4), 2018-19 (T-4)
18.72 MW
WR10 (59 components)
• Domestic EV
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-1), 2025-26 (T-4) ...
5.62 MW
Loading map...
Showing 14 locations