Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

ADD Renewables Limited

44 unique locations (399 components) - Page 1 of 2

Active MW: 12.75 MW
Inactive MW: 53.00 MW
10-14 Birmingham Road, West Bromwich, B71 4LD (5 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant (2)

Active • 2024-25 (T-4), 2021-22 (T-1)
Banbury Power Hennef Way Grimsbury Banbury OX16 3WA (3 components)

Banbury Power will be a 12MW power plant comprising gas reciprocating engines. The export of the power plant is connected to the local distribution network via two separately metered 6MW …

Inactive • 2019-20 (T-1)
Beanfield No 1 HL, BEANFIELD #1 HL, Uppingham Road, CORBY Northamptonshire, NN17 2UJ (7 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
Bond Avenue Bletchley Milton Keynes MK1 1JJ (24 components)

The CMU component comprises of three 2MW Reciprocating Gas Engines

Active • 2028-29 (T-4), 2027-28 (T-4) ...
Bond Estates Milton Keynes MK1 1JJ (3 components)

The CMU component comprises of three 2MW Combined Cycle Gas Turbines (CCGT)

G2 Energy Limited Not Prequalified MK1
Inactive • 2020-21 (T-4), 2017-18 (T-1)
Brackley STW, BRACKLEY STW (NEW), Turweston Field, BRACKLEY Northamptonshire, NN13 5JB, (7 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
Corby 3 - Sallow Road, Hunters Court, Corby, Northamptonshire, NN17 5JX (10 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2024-25 (T-4), 2023-24 (T-1) ...
Cowley Substation Blackberry Lane Garsington Oxfordshire OX44 9BD (9 components)
• The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.
• The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Croft Road, Coventry, CV1 3AZ (2 components)

"Planet Ice - UK Croft Road, Coventry, CV1 3AZ The CMU Component reduces import demand by turning off equipment and other non-essential loads."

ENEL X UK LIMITED Not Prequalified CV1
Inactive • 2017-18 (TR)
DEANSHANGER HL, DEANSHANGER HL, DEANSHANGER, MILTON KEYNES, MK19 6BJ, (7 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
Downing Street, Smethwick, West Midlands, B66 2PG (4 components)

"EMR European Metal Recycling Downing Street, Smethwick, West Midlands, B66 2PG The CMU Component reduces import demand by turning off equipment and other non-essential loads."

ENEL X UK LIMITED Not Prequalified B66
Inactive • 2017-18 (TR)
DUSTON MILL-PITSFORD WA, DUSTON MILL RIVER INTAKE, NN5 6ER (18 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2025-26 (T-4), 2024-25 (T-4) ...
2.81 MW
Eathorpe RI, Eathorpe, Leamington Spa, Warwickshire, CV33 9DE (6 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Inactive • 2022-23 (T-1), 2021-22 (T-1)
Eathorpe RI, Eathorpe, Leamington Spa, Warwickshire, CV33 9DF (3 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Inactive • 2023-24 (T-1)
2.81 MW
EMR Coventry, Webster Sidings, Coventry, CV6 5DJ (10 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2025-26 (T-4), 2024-25 (T-1) ...
2.81 MW
EMR Kingsbury, Trinity Rd, Tamworth, B78 2LB (10 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2025-26 (T-4), 2024-25 (T-1) ...
2.81 MW
EMR Landor Street , Landor Street, Nechells , B8 1AF (20 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2025-26 (T-4), 2024-25 (T-1) ...
2.81 MW
EMR Northampton, Harvey Reeves Road, Northampton, NN5 5JR (10 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2025-26 (T-4), 2024-25 (T-1) ...
2.81 MW
EMR Smethwick, Downing Street, Smethwick, West Midlands , B66 2PG (20 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2025-26 (T-4), 2024-25 (T-1) ...
2.81 MW
Great Houghton HL, GT HOUGHTON HL, Leys Lane, Great Houghton, NORTHAMPTON, NN4 0AN, (7 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
Hobs Moat Road, Solihull, B92 8JN (3 components)

"Planet Ice - UK Hobs Moat Road, Solihull, B92 8JN The CMU Component reduces import demand by turning off equipment and other non-essential loads."

ENEL X UK LIMITED Not Prequalified B92
Inactive • 2017-18 (TR)
Huncote Road, Croft, Leicester LE9 3GS (4 components)

"Aggregate Industries UK Ltd Huncote Road, Croft, Leicester LE9 3GS The CMU Component reduces import demand by turning off equipment and other non-essential loads."

ENEL X UK LIMITED Not Prequalified LE9
Inactive • 2017-18 (TR)
Ise Valley TPS, WELLINGBOROUGH-ISE VALLEY TPS, Irthlingborough Road, WELLINGBOROUGH Northamptonshire, NN8 1RA, (7 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
Kiln Power, Unit 6, Lime Kilns Business Park, Nutts Lane, Hinckley, Leicestershire, LE10 3EL. (34 components)
• Kiln Power is a 16 MW power plant comprising gas reciprocating engines. The export of the power plant is connected to the local distribution network via two separately metered 8MW connections (of which this is one of the two CMU components) and it is connected to the local gas network. Kiln Power has a single Balancing Service ID - NGSTORKILN218. To distinguish between the two components of the CMU a numbering system has been used. The two components are separately metered.
• Kiln Power is a 16 MW power plant comprising gas reciprocating engines. The export of the power plant is connected to the local distribution network via two separately metered 8MW connections (of which this is one of the two CMU components) and it is connected to the local gas network. Kiln Power has a single Balancing Service ID - NGSTORKILN218. To distinguish between the two components of the CMU a numbering system has been used. The two components are separately metered.
• Kiln Power is a 16 MW power plant comprising gas reciprocating engines. The export of the power plant is connected to the local distribution network via two separately metered 8MW connections (of which this is one of the two CMU components) and it is connected to the local gas network. connections and it is connected to the local gas network. Kiln Power has a single Balancing Service ID - NGSTORKILN218. To distinguish between the two components of the CMU a numbering system has been used. The two components are separately metered.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
LAND AND BUILDINGS LYING TO THE SOUTH EAST OF ROMAN ROAD WHEATLEY OX33 1LH (4 components)

CMU consisting of multiple reciprocating engines and alternators

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Loading map...
Showing 25 locations