Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

ADD Renewables Limited

6 unique locations (296 components)

Active MW: 0.00 MW
Inactive MW: 65.75 MW
WR10 (59 components)
• Domestic EV
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-1), 2025-26 (T-4) ...
5.62 MW
LD3 (38 components)
• Domestic EV charge point
• Domestic EV charger
Active • 2025-26 (T-1), 2025-26 (T-4) ...
KILN WAY PADDOCK WOOD TONBRIDGE KENT TN12 (3 components)
• Domestic EV charger
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• Thurgaton CMU Outlined in associated Construction Plan Output metered net of Station Load - no separate metered auxiliary exists
Active • 2025-26 (T-4), 2025-26 (T-1) ...
5.62 MW
GL52 (135 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
2.81 MW
EX23 (33 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2025-26 (T-1), 2025-26 (T-4) ...
2.81 MW
EH41 (28 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
18.72 MW
Loading map...
Showing 6 locations