[PARENT] Statera Energy Limited

38 unique locations (225 components) - Page 1 of 2

Active MW: 0.00 MW
Inactive MW: 0.00 MW
132 Manchester Road, Carrington, Manchester, M31 4AY (18 components)
• 49.5 MW Gas Reciprocating engines with all ancillary equipment to be installed on the Trafford Power Site
• 5 x 4.5MW Gas Reciprocating engines with all ancillary equipment to be installed on the Trafford Power Site
• One 4.5MW Gas Reciprocating engine with all ancillary equipment to be installed on the Trafford Power Site
Active • 2027-28 (T-4), 2025-26 (T-4) ...
GREENMOOR BANK FARM, OLD HUTTON, KENDAL, LA8 0NT (3 components)
• Battery Storage Plant
• Gas peaking reciprocating engine
• Gas peaking reciprocating engines
Inactive • 2022-23 (T-4), 2021-22 (T-4)
HOWICK HALL FARM HOWICK CROSS LANE, PENWORTHAM, PRESTON, PR1 0NS (16 components)
• Battery Storage Plant
• Gas peaking reciprocating engines
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Land at Burn Park Farm, Cottingham, HU16 5SB (7 components)
• Battery storage plant
• Gas Peaking Reciprocating engines
• Gas peaking reciprocating engine
Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
land at Walton Common north of the National Grid Substation, Fort Road, Tilbury, RM18 8UL. (7 components)
• Battery Storage plant
• Gas reciprocating engines
• Thurrock Power Limited has secured a "blue chip" manufacturer as the EPC contractor to engineer, procure and construct a battery storage plant on at land at Walton Common north of the National Grid Substation, Fort Road, Tilbury, RM18 8UL.. Thurrock Power Limited will be constructed to be a brand new generating asset and is expected to have an equipment design life of 20 years. An experienced Operations & Maintenance contractor will be employed to ensure the plant is running effectively and efficiently to meet Capacity Market requirements. An Independent technical expert will be engaged to confirm the Plant will meet the Extended Years Criteria, Financial Commitment Milestone, and 6 monthly report for the Delivery Body as required under paragraph 8.3.6A of the Capacity Market Rules.
• ... and 1 more unique description
Active • 2027-28 (T-4), 2026-27 (T-4) ...
Land north of the railway Line, Bellamour Lane, Wolsey Bridge  WS15 3JS (14 components)

Gas peaking reciprocating engine

Active • 2026-27 (T-4), 2025-26 (T-4) ...
Land off Hogshaw Road, Granborough, Buckingham, MK18 3NL (2 components)

Battery Storage Plant

Active • 2028-29 (T-4), 2027-28 (T-4)