[PARENT] Centrica plc
113 unique locations (1219 components) - Page 3 of 5
Eastfield Road, North Killingholme, Immingham, North Lincolnshire, DN40 3LW (69 components)
Edgabaston, Birmingham, West Midlands, B15 2TT (40 components)
Farburn?Place, Dyce, Aberdeen, AB21 7GP (2 components)
Battery Storage 2 hour duration
Felindre Rd, Pencoed, Bridgend, CF35 5HU (2 components)
A new build, gas fuelled generation station
Felindre Road, Pencoed, Brigend, CF35 5HU (1 component)
New build 40MW gas Peaker plant
Forth Drove, Peterborough PE1 5NT (7 components)
A Prospective New Build Gas reciprocating energy reserve facility
Gateshead Local Environmental Services, Park Road, Gateshead, NE8 3HN (7 components)
Battery storage
Great Maze Pond, London, SE1 9RT (6 components)
Site with behind the meter diesel generation - offsetting site load and exporting surplus.
Greenfield site, Stainton, Rotherham, S66 7RQ (1 component)
Battery Storage 2 hour duration
Gunnels Wood Road, Stevenage, SG1 2NY, United Kingdom (30 components)
On-site existing CHP generating unit
Harmire Road, Barnard Castle, County Durham, DL12 8D (11 components)
On-site existing CHP generating unit
Harmire Road, Barnard Castle, County Durham, DL12 8DT (26 components)
On-site existing CHP generating unit
Horizon Business Centre, Peachman Way, Broadlands, Norwich, NR7 0WF (4 components)
On-site gen / demand reduction capability
Howard Road, Park Farm Industrial Estate, Redditch B98 7SE (1 component)
Redditch 20MW Gas Peaker
Howard Road, Park Farm Industrial Estate, Redditch, B98 7SE (6 components)
Redditch 20MW Gas Peaker Project
Huntingdon, PE29 6WP (5 components)
Site with behind the meter diesel generation - offsetting site load and exporting surplus.
Kemsley Mill, SittingBourne, Kent, ME10 2TD (10 components)
Knapton Generating Station, East Knapton, Malton, North Yorkshire, YO17 8JF (8 components)
Generating Station, the power generation facilities consist of RLM 6000 EGT generation package with a LM6000 gas turbine
Maidenhead Road, Windsor, SL4 5GD (12 components)
Malmpit Hill, Codford, Wiltshire, England, BA12 0FD (3 components)
Malton Road, Malton, West Knapton Yorkshire, YO17 8JF (2 components)
A 28MW new build of battery storage unit.
Malton Road, Malton YO17 8JF (1 component)
A 40MW new build of battery storage unit.
Mann Island, Liverpool L3 1DG (16 components)
On-site gen / demand reduction capability
Medway NHS Foundation Trust, Windmill Road, Gillingham, ME7 5NY (1 component)
1.166MW CHP
Medway NHS Foundation Trust, Windmill Road, Gillingham, ME7 5NY (2 components)
1.166MW CHP