CMU WILL_C

3 unique locations - 1377.0MW total capacity

Leighton Hall Farm, Middlewich Road, Leighton, Crewe, CW1 4QH (4 components)
• 10 x 2MW/2MWh containerised Energy Storage System Units to be installed on designated land at Leighton Hall Farm.
• Unit 1 Cruachan pumped storage hydro plant
Inactive • 2023-24 (T-4), 2022-23 (T-3)
Plot C Land at Severn Road Avonmouth BS10 7SE (3 components)

The CMU will be formed of multiple individual Batteries. This site is to include a Battery Energy Storage System (BESS) that can either operate as import or export at will. …

Inactive • 2023-24 (T-4), 2022-23 (T-4)
25.50 MW
Power Station Road Isle of Grain Rochester ME3 0AR (69 components)
• Grain B CCGT Unit 6 Grain B power station provides heat to the Grain LNG regasification facility.
• OCGT from Grain U1. Fuel is Diesel as specified in BS EN590
• OCGT from Grain U4. Fuel is Diesel as specified in BS EN590
Active • 2028-29 (T-4), 2027-28 (T-4) ...
2886.91 MW