Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

CMU WILL_C

14 unique locations - 1377.0MW total capacity

BARNS UNIT C AYCHLEY FARM MARKET DRAYTON SHROPSHIRE TF9 (12 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
204.00 MW
Britned Convertor Station, Gate C, Grain Road, Isle of Grain, Kent, ME3 0AE (15 components)
• BritNed is a 1200MW (TEC) electricity interconnector connecting the electricity transmission systems in the Netherlands and Great Britain.
• BritNed is a 1320MW (CEC) electricity interconnector connecting the electricity transmission systems in the Netherlands and Great Britain.
• BritNed is a electricity interconnector connecting the electricity transmission systems in the Netherlands and Great Britain.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
1105.23 MW
HOLTS GREEN GREAT BRICKHILL MILTON KEYNES MK17 (9 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
21.60 MW
LAND AT L C P AUTOSURE BRIDGE ROAD ASHFORD TN23 1BB (7 components)

CMU consisting of multiple reciprocating engines and alternators

Active • 2024-25 (T-4), 2023-24 (T-4) ...
3.86 MW
LAND AT L C P AUTOSURE BRIDGE ROAD ASHFORD TN23 1BB (9 components)
• CMU consisting of multiple reciprocating engines and alternators
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Active • 2024-25 (T-4), 2023-24 (T-1) ...
33.22 MW
Land to the east side of Brunel Road, Manor Trading Estate, Benfleet, Essex, SS7 4PS (14 components)
• 14 MW power plant comprising reciprocating engines. The power plant will be connected to the local distribution network and local gas network.
• District heating implementation of two gas CHP engines with no auxilliary load
• OCGT from Grain U1. Fuel is Gas Oil as specified in BS 2869 Class A2
Active • 2024-25 (T-4), 2023-24 (T-4) ...
MSU 2 Block C Southgate Somerset Great Britain Bath BA1 1SS (1 component)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2025-26 (T-4)
North Avenue, Marston Green, Birmingham, B40 1NT. (12 components)
• Gas Generator - ENER-G 1521 - proposed to be installed on land to the north-east elevation of Hall 5 at the NEC Site.
• Import/Export metering with diesel generation at a retail store
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Plot C, Land at Severn Road Avonmouth BS10 7SE (3 components)

Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours

Active • 2027-28 (T-4), 2026-27 (T-4)
48.09 MW
Power Station Road Isle of Grain Rochester ME3 0AR (69 components)
• Grain B CCGT Unit 6 Grain B power station provides heat to the Grain LNG regasification facility.
• OCGT from Grain U1. Fuel is Diesel as specified in BS EN590
• OCGT from Grain U4. Fuel is Diesel as specified in BS EN590
Active • 2028-29 (T-4), 2027-28 (T-4) ...
2886.91 MW
Loading map...
Showing 10 locations